Questions? Write to T1 CDB team

GlobalTag: 1 items found         Click on items for more details


Name ID Default? Description Status Type Modified Mod. by Total Payloads Distinct Payloads
beam_bg_sim_20210616_early-phase3_belle2-beast2_farbeamline_modified_shielding 1908
Early Phase3 Belle II + Beast II within the IR+FarBeamline (|s|<26m). Geometry payloads for the beam-induced background simulation. It requires some modifications of the Belle II sub-system settings (study). For now, the Beast II system is not present in DB so its geometry is built from the XML file. Tested with the master_2021-06-28 branch. + Modified shielding around Belle II, better geometry implementation
TESTING DEV 07/15/2021 7:02 a.m. anatochi 19 19