Questions? Write to T1 CDB team

GlobalTag: 1 items found         Click on items for more details


Name ID Default? Description Status Type Modified Mod. by Total Payloads Distinct Payloads
beam_bg_sim_20211202_early-phase3_belle2-beast2_farbeamline 2168
Early Phase3 Belle II + Beast II within the IR+FarBeamline (|s|<26m). Geometry payloads for the beam-induced background simulation. It requires some modifications of the Belle II sub-system settings (study). For now, the Beast II system is not implemented in the DB so its geometry is built from the XML file.
TESTING DEV 12/08/2021 3:48 p.m. anatochi 19 19