beam_bg_sim_20211220_early-phase3_belle2-beast2_farbeamline_run-dependent_exp22_run0624-0633_NewIpBeamPipeParts |
2492 |
✘ |
Early Phase3 Belle II + Beast II within the IR+FarBeamline (|s|<26m). Geometry payloads for the beam-induced background simulation. The FarBeamline geometry is improved (Feb 2022). It requires some modifications of the Belle II sub-system settings (study). The Beast II system is not present in DB, so its geometry is built from the XML file. This GT can be used for the run-dependent MC sample production. exp/run = 22/0624-0633. New IP beam pipe parts. |
TESTING |
DEV |
06/03/2022 2:32 a.m. |
anatochi |
19 |
19 |