|
Name | ID | Default? | Description | Status | Type | Modified | Mod. by | Total Payloads | Distinct Payloads |
---|---|---|---|---|---|---|---|---|---|
staging_master_casarosa_20200324-165416 | 916 | ✘ | a new cut on the time difference of SVD clusters is introduced as new feature. the cut is applied only for experiment 0, it is not applied for exp 1002 and 1003 |
OPEN | DEV | 03/24/2020 4:54 p.m. | casarosa | 2 | 1 |
staging_master_casarosa_20210525-080019 | 1711 | ✘ | a new payload is needed for SVD reconstruction. This revision is to be used for data reconstruction, specifically it should be added to the validation GT (currently validation_2020-08-11) |
OPEN | DEV | 05/25/2021 8 a.m. | casarosa | 1 | 1 |
IP_MC13a_proc11 | 1070 | ✘ | BeamParameters and BeamSpot for MC13a_proc11 |
OPEN | DEV | 05/18/2020 3:08 p.m. | casarosa | 4 | 2 |
IP_MC13b_proc11 | 1071 | ✘ | BeamParameters and BeamSpot for MC13b_proc11 |
OPEN | DEV | 05/18/2020 3:08 p.m. | casarosa | 8 | 4 |
IP_MC13b_prompt | 1248 | ✘ | BeamParameters and BeamSpot for MC13b_prompt |
TESTING | RELEASE | 08/10/2020 11:32 a.m. | casarosa | 4 | 4 |
charm_beamSpot_misalignment_v0_1 | 1245 | ✘ | BeamSpot calibration with misalignment in charm_misalignment_v0_1 GT |
TESTING | RELEASE | 07/27/2020 3:19 p.m. | casarosa | 1 | 1 |
charm_beamSpot_misalignment_v0 | 1244 | ✘ | BeamSpot calibration with misalignment in charm_misalignment_v0 GT |
TESTING | RELEASE | 07/27/2020 3:18 p.m. | casarosa | 1 | 1 |
charm_beamSpot_misalignment_v1_1 | 1247 | ✘ | BeamSpot calibration with misalignment in charm_misalignment_v1_1 GT |
TESTING | RELEASE | 07/27/2020 3:20 p.m. | casarosa | 1 | 1 |
charm_beamSpot_misalignment_v1 | 1246 | ✘ | BeamSpot calibration with misalignment in charm_misalignment_v1 GT |
TESTING | RELEASE | 07/27/2020 3:20 p.m. | casarosa | 1 | 1 |
beamSpot_bucket10 | 1145 | ✘ | BeamSpot paylaods for bucket10 |
TESTING | RELEASE | 06/05/2020 7:36 a.m. | casarosa | 260 | 1 |
beamSpot_bucket11 | 1146 | ✘ | BeamSpot paylaods for bucket11 |
TESTING | RELEASE | 06/05/2020 9:03 a.m. | casarosa | 268 | 1 |
beamSpot_bucket12 | 1147 | ✘ | BeamSpot paylaods for bucket12 |
TESTING | RELEASE | 06/05/2020 9:03 a.m. | casarosa | 81 | 1 |
beamSpot_bucket9 | 1144 | ✘ | BeamSpot paylaods for bucket9 |
TESTING | RELEASE | 06/05/2020 7:35 a.m. | casarosa | 243 | 1 |
temp_validation_casarosa_20220625-160226 | 2549 | ✘ | better calibrations |
OPEN | DEV | 06/25/2022 4:02 p.m. | casarosa | 1 | 1 |
staging_master_casarosa_20190926-165328 | 720 | ✘ | bug-fix: classDef increased |
OPEN | DEV | 09/26/2019 4:55 p.m. | casarosa | 1 | 1 |
staging_master_casarosa_20190919-144139 | 708 | ✘ | bug-fix = updated class def |
OPEN | DEV | 09/19/2019 2:41 p.m. | casarosa | 1 | 1 |
tracking_CDCCorrToThresholds_2.0 | 3104 | ✘ | CDCCorrToThresholds set to 2.0 |
TESTING | DEV | 11/03/2023 9:32 a.m. | casarosa | 1 | 1 |
tracking_CDCCorrToThresholds_2.8 | 3105 | ✘ | CDCCorrToThresholds set to 2.8 |
TESTING | DEV | 11/03/2023 9:31 a.m. | casarosa | 1 | 1 |
svd_L3_ladder_numbering | 418 | ✘ | change of L3 ladder numbering to match the construction adn online numbering scheme |
OPEN | DEV | 07/13/2018 9:42 a.m. | casarosa | 1 | 1 |
svd_test_APVCouplings_v0 | 1860 | ✘ | charge sharing couplings optimized for release-06 with APVcouplings = 0 |
TESTING | DEV | 06/25/2021 2:33 p.m. | casarosa | 1 | 1 |
svd_SVDCoGCalibration_latency_plus4716 | 666 | ✘ | CoG calibration on MC with: 1. updated APV latency = +47.16; 2. pol3 TB independent calibration function |
OPEN | DEV | 07/30/2019 2:13 p.m. | casarosa | 1 | 1 |
svdonly_phase2analysis_with_master | 424 | ✘ | contains payloads to allow SVD reconstruction with master later than release-02 |
OPEN | DEV | 07/26/2018 4:10 p.m. | casarosa | 23 | 23 |
svd_offlineCalibrations | 602 | ✘ | contains the payloads for the svd reconstruction |
OPEN | DEV | 06/21/2022 10:12 a.m. | casarosa | 68 | 13 |
svd_offlineCalibrations_20190307 | 551 | ✘ | contains the payloads for the svd reconstruction |
OPEN | DEV | 03/07/2019 3:04 p.m. | casarosa | 3 | 3 |
svd_newCoGCorrections | 437 | ✘ | contains the SVD payload that provides corrections to the hit time, evaluated on Y(4S) MC events. L3 has corrected ladder numbering, the svd geometry payload with fixed numbering is also contained in this tag |
OPEN | DEV | 10/05/2018 1:54 p.m. | casarosa | 5 | 5 |