Questions? Write to T1 CDB team

GlobalTag: 3197 items found         Click on items for more details


Name ID Default? Description Status Type Modified Mod. by Total Payloads Distinct Payloads
staging_master_depietro_20200615-145351 1162
A new DBObject is created to hold the EventsOfDoomBuster module parameters
OPEN DEV 06/15/2020 2:54 p.m. depietro 1 1
svd_GTusedToChangeUniqueIDNames 788
GT created to change the uniqueID of the payloads
OPEN DEV 11/15/2019 11:01 a.m. lgcorona 7 1
alignment_2019c_v1 763
First attempt to align exp10 VXD + CDC layers + IP. Using Bon cosmics 3431,3432 + physics 3398 (all exp10)
TESTING DEV 11/04/2019 9:03 a.m. bilkat 0 0
newpayload-test-online 872
test online by adding a new payload
TESTING DEV 02/12/2020 9:04 a.m. chunhua 777 401
bilka_CDCCalibrationsB0exp8_rel4_patch 703
Tag with fixed CDC calibrations for exp 8 B0 data - from run 3463
TESTING DEV 09/12/2019 2:12 p.m. bilkat 4 4
upgrade_2020-02-23_vtx_5layer 885
Development GT for Belle II w/o PXD+SVD and w/ 5 layer VTX
TESTING DEV 02/23/2020 6:27 p.m. benni 2 2
ECL_timing_pre_proc10_backup_v2 743
GT to gather all the ECL timing calibrations for proc10
OPEN DEV 10/11/2019 4:02 a.m. ehill 355 2
svd_svdHitTimeSelection_test 889
test GT to optmizie cut on time difference of U and V cluster in SP creation
TESTING DEV 03/24/2020 5:46 p.m. casarosa 11 1
carlos_test 297
test tag creation
INVALID DEV 11/21/2018 8:46 p.m. TEST USER 4 4
alignment_stage0_proc10_block-7-2734-8-349 749
Initial pre-alignment from zeros for proc10 for VXD + CDC (layers)
TESTING DEV 10/19/2019 9:58 a.m. tadeas 10 9
gdujany_BIISVD-175 729
GT containing the modified versions of the payloads mentioned in BIISVD-175 where m_uniqueID is filled
TESTING DEV 11/11/2019 3:31 p.m. gdujany 3 3
alignment_stage1_proc10 750
Starting alignment using verte-constrained decays. Still time-independent - the purpose is to now add Boff cosmics (should have been done ideally already at stage 0) and basic time dependence(stage2), then wire-by-wire alignment on top of that(stage3).
TESTING DEV 10/19/2019 4:57 p.m. tadeas 3 3
staging_validation 661
staging GT for holding new or updated payloads for validation GT
OPEN DEV 10/21/2019 9:41 a.m. jikumar 1 1
clone-online-20190926-chunhua-tmp 713
temporary gt for testing
OPEN DEV 10/22/2019 7:41 a.m. chunhua 718 393
alignment_stage2_proc10 752
Time-dependent global alignment of VXD+CDC+BeamSpot with single physics run E7R349, IoV extended backwards and forwards (real data boundaries: E7R2206-E8R349)
TESTING DEV 10/22/2019 1:49 p.m. bilkat 6 3
clone-online-20191117-2 796
clone of gt online after modification
TESTING DEV 11/17/2019 12:55 p.m. chunhua 763 396
clone-online-20191127 805
clone of gt online on Nov.27,2019
OPEN DEV 11/27/2019 1:39 p.m. chunhua 763 396
ECL_timing_preProc10_IOVholes 820
Proc 10 ECL timing calibration constants. IOV not yet fixed.
OPEN DEV 12/07/2019 1:46 a.m. ehill 1301 2
staging_data_reprocessing_prompt_local_svd 835
Staging tag for the SVD local calibrations to be used in the prompt calibration
OPEN DEV 12/17/2019 6:34 p.m. tamponi 0 0
AIRFLOW_TEST_staging_localcalib_proposal 715
A working tag where modifications to the payloads are made often. Used to hold a copy of the local staging payloads, which we then perform modifications on in order to try and remove problems(overlaps, gaps, etc).
OPEN DEV 12/07/2019 1:11 p.m. ddossett 12 1
ECL_configuration_invalidated_2019.12.14 693
Payloads with ECL electronics configuration. Energy thresholds, attenuator coefficients and, potentially, values of several important registers.
OPEN DEV 12/13/2019 6:06 p.m. remnev 276 5
data_reprocessing_proc10clone 829
Staging global tag for the major reprocessings
VALIDATED DEV 12/12/2019 9:35 p.m. tamponi 14678 125