Name | ID | Default? | Description | Status | Type | Modified | Mod. by | Total Payloads | Distinct Payloads |
---|---|---|---|---|---|---|---|---|---|
analysis_tools_release-03-02-00 | 647 | ✘ | Global tag containing payloads for high-level analysis tools. In particular, it contains the weight files of the flavor tagger. |
PUBLISHED | DEV | 04/08/2020 3:13 p.m. | abudinen | 48 | 48 |
analysis_tools_2019-04-11 | 580 | ✘ | Global tag containing payloads for analysis tools. In particular, it contains the weight files of the flavor tagger. |
PUBLISHED | DEV | 05/03/2019 3:18 p.m. | abudinen | 93 | 78 |
staging_analysis_abudinen_20200324-191447 | 917 | ✘ | New FBDT flavorTagger payloads for b2bii and for Belle II trained with MC13a. The new b2bii payloads avoid the old buggy kIDBelle variable and use instead the atc variable. Payloads were produced with release-04-01-05. |
OPEN | DEV | 03/24/2020 7:15 p.m. | abudinen | 30 | 30 |
analysis_tools_release-03-01-00 | 556 | ✘ | Global tag containing payloads for analysis tools. In particular, it contains the weight files of the flavor tagger. |
PUBLISHED | DEV | 04/08/2020 3:12 p.m. | abudinen | 109 | 94 |
leptonid_official_rel6_mc15ri | 3282 | ✘ | mc15ri leptonid correction tables, coarse binning |
PUBLISHED | DEV | 04/18/2024 10:37 a.m. | alegaz | 80 | 80 |
leptonid_official_rel6_mc15ri_dense | 3283 | ✘ | mc15ri leptonid correction tables, dense binning |
PUBLISHED | DEV | 04/18/2024 10:38 a.m. | alegaz | 40 | 40 |
leptonid_official_rel6_mc15rd | 3284 | ✘ | mc15rd leptonid correction tables, coarse binning |
PUBLISHED | DEV | 04/18/2024 10:39 a.m. | alegaz | 16 | 16 |
mc_production_CDCTrigger_exp24_26 | 2636 | ✘ | GT needed for MC15rd, including proper CDCTRG deadchannel corresponding to exp24-26 |
TESTING | DEV | 08/09/2022 8:14 a.m. | amartini | 38 | 1 |
beam_bg_sim_20211220_early-phase3_belle2-beast2_farbeamline_run-dependent_exp12_run3759-3783 | 2351 | ✘ | Early Phase3 Belle II + Beast II within the IR+FarBeamline (|s|<26m). Geometry payloads for the beam-induced background simulation. It requires some modifications of the Belle II sub-system settings (study). For now, the Beast II system is not present in DB so its geometry is built from the XML file. This GT can be used for the run-dependent MC sample production. exp/run = 12/3759-3783 |
OPEN | DEV | 02/28/2022 8:31 a.m. | anatochi | 19 | 19 |
beam_bg_sim_20210616_early-phase3_belle2-beast2_farbeamline_modified_shielding_extended | 1917 | ✘ | Early Phase3 Belle II + Beast II within the IR+FarBeamline (|s|<26m). Geometry payloads for the beam-induced background simulation. It requires some modifications of the Belle II sub-system settings (study). For now, the Beast II system is not present in DB so its geometry is built from the XML file. Tested with the master_2021-06-28 branch. + Modified shielding around Belle II, better geometry implementation + extended cavern walls |
TESTING | DEV | 07/19/2021 10:11 a.m. | anatochi | 19 | 19 |
beam_bg_sim_fullVXD_snowmass_03mm_belle2-beast2_farbeamline | 2327 | ✘ | Phase3 (full VXD) Belle II + Beast II within the IR+FarBeamline (|s|<29m). Geometry payloads for the beam-induced background simulation. It requires some modifications of the Belle II sub-system settings (study). For now, the Beast II system is not present in DB so its geometry is built from the XML file. Used for the Snowmass beta*y=0.3mm optics. |
TESTING | DEV | 02/05/2022 7:39 a.m. | anatochi | 20 | 20 |
beam_bg_sim_20210616_early-phase3_belle2-beast2_farbeamline | 1891 | ✘ | Early Phase3 Belle II + Beast II within the IR+FarBeamline (|s|<26m). Geometry payloads for the beam-induced background simulation. It requires some modifications of the Belle II sub-system settings (study). For now, the Beast II system is not present in DB so its geometry is built from the XML file. Tested with the master_2021-06-28 branch. |
TESTING | DEV | 07/05/2021 7:07 a.m. | anatochi | 19 | 19 |
beam_bg_sim_20211202_early-phase3_belle2-beast2_farbeamline | 2168 | ✘ | Early Phase3 Belle II + Beast II within the IR+FarBeamline (|s|<26m). Geometry payloads for the beam-induced background simulation. It requires some modifications of the Belle II sub-system settings (study). For now, the Beast II system is not implemented in the DB so its geometry is built from the XML file. |
TESTING | DEV | 12/08/2021 3:48 p.m. | anatochi | 19 | 19 |
beam_bg_sim_20211220_early-phase3_belle2-beast2_farbeamline_run-dependent_exp22_run0624-0633 | 2355 | ✘ | Early Phase3 Belle II + Beast II within the IR+FarBeamline (|s|<26m). Geometry payloads for the beam-induced background simulation. The FarBeamline geometry is improved (Feb 2022). It requires some modifications of the Belle II sub-system settings (study). The Beast II system is not present in DB, so its geometry is built from the XML file. This GT can be used for the run-dependent MC sample production. exp/run = 22/0624-0633 |
TESTING | DEV | 03/01/2022 2:08 a.m. | anatochi | 19 | 19 |
beam_bg_sim_partialVXD_snowmass_08mm_belle2-beast2_farbeamline | 2319 | ✘ | Early Phase3 (partial VXD) Belle II + Beast II within the IR+FarBeamline (|s|<29m). Geometry payloads for the beam-induced background simulation. It requires some modifications of the Belle II sub-system settings (study). For now, the Beast II system is not present in DB so its geometry is built from the XML file. Used for the Snowmass beta*y=0.8mm optics. |
TESTING | DEV | 01/29/2022 11:28 p.m. | anatochi | 19 | 19 |
beam_bg_sim_20210616_early-phase3_belle2-beast2_farbeamline_improved | 2072 | ✘ | Early Phase3 Belle II + Beast II within the IR+FarBeamline (|s|<26m). Geometry payloads for the beam-induced background simulation. It requires some modifications of the Belle II sub-system settings (study). For now, the Beast II system is not present in DB so its geometry is built from the XML file. Tested with the master_2021-06-28 branch. + Modified shielding around Belle II: Floor level of the tunnel fixed (-1950mm -> -1520mm); More realistic accelerator tunnel geometry, though still with some unknowns; Magnets' supports; Cryostat floats supports; Beam pipes extended a little. |
TESTING | DEV | 10/13/2021 5:55 p.m. | anatochi | 19 | 19 |
beam_bg_sim_fullVXD_snowmass_06mm_belle2-beast2_farbeamline | 2322 | ✘ | Phase3 (full VXD) Belle II + Beast II within the IR+FarBeamline (|s|<29m). Geometry payloads for the beam-induced background simulation. It requires some modifications of the Belle II sub-system settings (study). For now, the Beast II system is not present in DB so its geometry is built from the XML file. Used for the Snowmass beta*y=0.6mm optics. |
TESTING | DEV | 02/01/2022 6:50 a.m. | anatochi | 20 | 20 |
beam_bg_sim_20211220_early-phase3_belle2-beast2_farbeamline | 2218 | ✘ | Early Phase3 Belle II + Beast II within the IR+FarBeamline (|s|<26m). Geometry payloads for the beam-induced background simulation. It requires some modifications of the Belle II sub-system settings (study). For now, the Beast II system is not present in DB so its geometry is built from the XML file. |
TESTING | DEV | 01/06/2022 9:19 a.m. | anatochi | 19 | 19 |
beam_bg_sim_20210616_early-phase3_belle2-beast2_farbeamline_run-dependent_exp18_run2348-2360 | 2354 | ✘ | Early Phase3 Belle II + Beast II within the IR+FarBeamline (|s|<26m). Geometry payloads for the beam-induced background simulation. The FarBeamline geometry is improved (Feb 2022). It requires some modifications of the Belle II sub-system settings (study). The Beast II system is not present in DB, so its geometry is built from the XML file. This GT can be used for the run-dependent MC sample production. exp/run = 18/2348-2360 |
TESTING | DEV | 02/28/2022 2:50 p.m. | anatochi | 19 | 19 |
beam_bg_sim_early_phase3_belle2_beast2_ir_ver1 | 1416 | ✘ | Early Phase3 Belle II + Beast II within the IR (|s|<4m). Geometry payloads for the beam-induced background simulation. It requires some modifications of the Belle II sub-system settings (study). For now, the Beast II system is not present in DB so its geometry is built from the XML file. Tested with the master_2020-10-09 branch. |
TESTING | DEV | 01/20/2021 1:44 a.m. | anatochi | 18 | 18 |
beam_bg_sim_20210616_early-phase3_belle2-beast2_ir | 1892 | ✘ | Early Phase3 Belle II + Beast II within the IR (|s|<4m). Geometry payloads for the beam-induced background simulation. It requires some modifications of the Belle II sub-system settings (study). For now, the Beast II system is not present in DB so its geometry is built from the XML file. Tested with the master_2021-06-28 branch. |
TESTING | DEV | 07/05/2021 7:06 a.m. | anatochi | 18 | 18 |
beam_bg_sim_20210616_early-phase3_belle2-beast2_farbeamline_modified_shielding | 1908 | ✘ | Early Phase3 Belle II + Beast II within the IR+FarBeamline (|s|<26m). Geometry payloads for the beam-induced background simulation. It requires some modifications of the Belle II sub-system settings (study). For now, the Beast II system is not present in DB so its geometry is built from the XML file. Tested with the master_2021-06-28 branch. + Modified shielding around Belle II, better geometry implementation |
TESTING | DEV | 07/15/2021 7:02 a.m. | anatochi | 19 | 19 |
beam_bg_sim_fullVXD_snowmass_06mm_nlc_belle2-beast2_farbeamline | 2326 | ✘ | Phase3 (full VXD) Belle II + Beast II within the IR+FarBeamline (|s|<29m). Geometry payloads for the beam-induced background simulation. It requires some modifications of the Belle II sub-system settings (study). For now, the Beast II system is not present in DB so its geometry is built from the XML file. Used for the Snowmass beta*y=0.6mm optics with a non-linear collimator (NLC). |
TESTING | DEV | 02/04/2022 11:08 p.m. | anatochi | 20 | 20 |
beam_bg_sim_20200627_early-phase3_belle2-beast2_farbeamline_run-dependent_exp12_run6292-6309 | 2353 | ✘ | Early Phase3 Belle II + Beast II within the IR+FarBeamline (|s|<26m). Geometry payloads for the beam-induced background simulation. The FarBeamline geometry is improved (Feb 2022). It requires some modifications of the Belle II sub-system settings (study). The Beast II system is not present in DB, so its geometry is built from the XML file. This GT can be used for the run-dependent MC sample production. exp/run = 12/6292-6309 |
TESTING | DEV | 02/28/2022 2:51 p.m. | anatochi | 19 | 19 |
beam_bg_sim_20211220_early-phase3_belle2-beast2_farbeamline_run-dependent_exp22_run624-633 | 2256 | ✘ | Early Phase3 Belle II + Beast II within the IR+FarBeamline (|s|<26m). Geometry payloads for the beam-induced background simulation. It requires some modifications of the Belle II sub-system settings (study). The Beast II system is not present in DB, so its geometry is built from the XML file. This GT can be used for the run-dependent MC sample production. exp/run = 22/624-633 |
TESTING | DEV | 03/01/2022 1:16 a.m. | anatochi | 19 | 19 |