Questions? Write to T1 CDB team

GlobalTag: 1 items found         Click on items for more details


Name ID Default? Description Status Type Modified Mod. by Total Payloads Distinct Payloads
beam_bg_sim_early_phase3_belle2_beast2_ir_ver1 1416
Early Phase3 Belle II + Beast II within the IR (|s|<4m). Geometry payloads for the beam-induced background simulation. It requires some modifications of the Belle II sub-system settings (study). For now, the Beast II system is not present in DB so its geometry is built from the XML file. Tested with the master_2020-10-09 branch.
TESTING DEV 01/20/2021 1:44 a.m. anatochi 18 18