Questions? Write to T1 CDB team

Detail for GlobalTag "beam_bg_sim_early_phase3_belle2_beast2_ir_ver1" (ID: 1416)


Name ID Default? Description Status Type Inserted Modified Mod. by Total Payloads Distinct Payloads
beam_bg_sim_early_phase3_belle2_beast2_ir_ver1 1416
Early Phase3 Belle II + Beast II within the IR (|s|<4m). Geometry payloads for the beam-induced background simulation. It requires some modifications of the Belle II sub-system settings (study). For now, the Beast II system is not present in DB so its geometry is built from the XML file. Tested with the master_2020-10-09 branch.
TESTING DEV 11/23/2020 9:19 a.m. 01/20/2021 1:44 a.m. anatochi 18 18

Payloads associated with the Global Tag "beam_bg_sim_early_phase3_belle2_beast2_ir_ver1" (ID 1416)