beam_bg_sim_20211220_early-phase3_belle2-beast2_farbeamline_run-dependent_exp12_run3759-3783 |
2351 |
✘ |
Early Phase3 Belle II + Beast II within the IR+FarBeamline (|s|<26m). Geometry payloads for the beam-induced background simulation. It requires some modifications of the Belle II sub-system settings (study). For now, the Beast II system is not present in DB so its geometry is built from the XML file. This GT can be used for the run-dependent MC sample production. exp/run = 12/3759-3783 |
OPEN |
DEV |
02/28/2022 8:31 a.m. |
anatochi |
19 |
19 |