Questions? Write to T1 CDB team

Detail for GlobalTag "beam_bg_sim_20211220_early-phase3_belle2-beast2_farbeamline_run-dependent_exp12_run3759-3783" (ID: 2351)


Name ID Default? Description Status Type Inserted Modified Mod. by Total Payloads Distinct Payloads
beam_bg_sim_20211220_early-phase3_belle2-beast2_farbeamline_run-dependent_exp12_run3759-3783 2351
Early Phase3 Belle II + Beast II within the IR+FarBeamline (|s|<26m). Geometry payloads for the beam-induced background simulation. It requires some modifications of the Belle II sub-system settings (study). For now, the Beast II system is not present in DB so its geometry is built from the XML file. This GT can be used for the run-dependent MC sample production. exp/run = 12/3759-3783
OPEN DEV 02/28/2022 8:27 a.m. 02/28/2022 8:31 a.m. anatochi 19 19

Payloads associated with the Global Tag "beam_bg_sim_20211220_early-phase3_belle2-beast2_farbeamline_run-dependent_exp12_run3759-3783" (ID 2351)