Questions? Write to T1 CDB team

Detail for GlobalTag "beam_bg_sim_20210616_early-phase3_belle2-beast2_ir" (ID: 1892)


Name ID Default? Description Status Type Inserted Modified Mod. by Total Payloads Distinct Payloads
beam_bg_sim_20210616_early-phase3_belle2-beast2_ir 1892
Early Phase3 Belle II + Beast II within the IR (|s|<4m). Geometry payloads for the beam-induced background simulation. It requires some modifications of the Belle II sub-system settings (study). For now, the Beast II system is not present in DB so its geometry is built from the XML file. Tested with the master_2021-06-28 branch.
TESTING DEV 07/05/2021 5:32 a.m. 07/05/2021 7:06 a.m. anatochi 18 18

Payloads associated with the Global Tag "beam_bg_sim_20210616_early-phase3_belle2-beast2_ir" (ID 1892)