Questions? Write to T1 CDB team

Detail for GlobalTag "beam_bg_sim_20211220_early-phase3_belle2-beast2_farbeamline_run-dependent_exp22_run624-633" (ID: 2256)


Name ID Default? Description Status Type Inserted Modified Mod. by Total Payloads Distinct Payloads
beam_bg_sim_20211220_early-phase3_belle2-beast2_farbeamline_run-dependent_exp22_run624-633 2256
Early Phase3 Belle II + Beast II within the IR+FarBeamline (|s|<26m). Geometry payloads for the beam-induced background simulation. It requires some modifications of the Belle II sub-system settings (study). The Beast II system is not present in DB, so its geometry is built from the XML file. This GT can be used for the run-dependent MC sample production. exp/run = 22/624-633
TESTING DEV 01/17/2022 12:29 a.m. 03/01/2022 1:16 a.m. anatochi 19 19

Payloads associated with the Global Tag "beam_bg_sim_20211220_early-phase3_belle2-beast2_farbeamline_run-dependent_exp22_run624-633" (ID 2256)