Questions? Write to T1 CDB team

Detail for GlobalTag "beam_bg_sim_20200627_early-phase3_belle2-beast2_farbeamline_run-dependent_exp12_run6292-6309" (ID: 2353)


Name ID Default? Description Status Type Inserted Modified Mod. by Total Payloads Distinct Payloads
beam_bg_sim_20200627_early-phase3_belle2-beast2_farbeamline_run-dependent_exp12_run6292-6309 2353
Early Phase3 Belle II + Beast II within the IR+FarBeamline (|s|<26m). Geometry payloads for the beam-induced background simulation. The FarBeamline geometry is improved (Feb 2022). It requires some modifications of the Belle II sub-system settings (study). The Beast II system is not present in DB, so its geometry is built from the XML file. This GT can be used for the run-dependent MC sample production. exp/run = 12/6292-6309
TESTING DEV 02/28/2022 9:07 a.m. 02/28/2022 2:51 p.m. anatochi 19 19

Payloads associated with the Global Tag "beam_bg_sim_20200627_early-phase3_belle2-beast2_farbeamline_run-dependent_exp12_run6292-6309" (ID 2353)