|
|
| Name | ID | Default? | Description | Status | Type | Inserted | Modified | Mod. by | Total Payloads | Distinct Payloads |
|---|---|---|---|---|---|---|---|---|---|---|
| user_qyliu_beam_bg_sim_20241115_run2_belle2-beast2_farbeamline_BII-8886_20260105 | 3969 | ✘ | Phase3 Belle II + Beast II within the IR+FarBeamline (|s|<26m). Geometry payloads for the beam-induced background simulation have been updated to post-LS1. |
TESTING | DEV | 03/10/2026 6:20 p.m. | 03/10/2026 6:21 p.m. | qyliu | 21 | 21 |
Payloads associated with the Global Tag "user_qyliu_beam_bg_sim_20241115_run2_belle2-beast2_farbeamline_BII-8886_20260105" (ID 3969) |