|
Name | ID | Default? | Description | Status | Type | Modified | Mod. by | Total Payloads | Distinct Payloads |
---|---|---|---|---|---|---|---|---|---|
test_CDCLayerAlignment_in_caf | 253 | ✘ | Test misaligned global tag for CDCLayerAlignment |
OPEN | DEV | 04/29/2017 4:11 p.m. | bilkat | 1 | 1 |
beamtest_vxd_april2017_rev1 | 270 | ✘ | VXD beam test 2017 - alignment |
OPEN | DEV | 06/27/2017 12:26 p.m. | bilkat | 22 | 7 |
bilka_CDCCalibrationsB0exp8_rel4_patch | 703 | ✘ | Tag with fixed CDC calibrations for exp 8 B0 data - from run 3463 |
TESTING | DEV | 09/12/2019 2:12 p.m. | bilkat | 4 | 4 |
alignment_reset_VXDCDC | 721 | ✘ | This GT contains VXD alignment with all zeros and CDC alignment with zeros for layers and wire x, y ends. The z-positions of the wires are inherited from older payloads where CDC group stored some survey measurements for this. The main purpose of this is to start with alignment from scratch (zeros). |
TESTING | DEV | 09/28/2019 2:53 p.m. | bilkat | 2 | 2 |
bilka_proc10_VXDCDCT0_i0_v1 | 723 | ✘ | First iteration for VXD+CDC+T0 |
TESTING | DEV | 09/30/2019 6:08 p.m. | bilkat | 30 | 9 |
alignment_stage2_proc10 | 752 | ✘ | Time-dependent global alignment of VXD+CDC+BeamSpot with single physics run E7R349, IoV extended backwards and forwards (real data boundaries: E7R2206-E8R349) |
TESTING | DEV | 10/22/2019 1:49 p.m. | bilkat | 6 | 3 |
alignment_cdcwirestest062019 | 753 | ✘ | CDC wire-by-wire alignment |
TESTING | DEV | 10/23/2019 4:35 p.m. | bilkat | 1 | 1 |
alignment_proc10_baselineOct28 | 755 | ✘ | New baseline alignment for proc10 using Bon+physics data after quench |
TESTING | DEV | 10/28/2019 11:41 a.m. | bilkat | 3 | 3 |
alignment_2019c_v1 | 763 | ✘ | First attempt to align exp10 VXD + CDC layers + IP. Using Bon cosmics 3431,3432 + physics 3398 (all exp10) |
TESTING | DEV | 11/04/2019 9:03 a.m. | bilkat | 0 | 0 |
alignment_BFieldOffExp1003Run1 | 844 | ✘ | GT for alignment MC studies with Magnet OFF in exp1003 run 1 (run 0 and other with Magnet ON |
OPEN | DEV | 12/23/2019 11:33 a.m. | bilkat | 2 | 1 |
alignmentMC_BFieldOffExp1003Run1 | 845 | ✘ | GT for alignment MC studies with Magnet OFF in exp1003 run 1 (run 0 and other with Magnet ON |
TESTING | DEV | 12/23/2019 11:43 a.m. | bilkat | 1 | 1 |
alignment_patch_BKLMDisplacement_from_master_2019-11-29 | 848 | ✘ | Only BKLMDisplacement payload missing for processing of real exp10 data with master |
TESTING | DEV | 01/27/2020 2:55 p.m. | bilkat | 7 | 7 |
alignment_test_2019c_from4937 | 868 | ✘ | Based on alignment_2019c_v4, realigned VXD hs+sensor-by-sensor(L6 fixed) + IP, IoV extended to whole exp10 |
TESTING | DEV | 02/02/2020 3:41 a.m. | bilkat | 3 | 3 |
alignment_bucket12_runByRun_v1 | 1130 | ✘ | Run-by-run pixel sensors + half-shells alignment for bucket12. Multiple CDC intervals |
TESTING | DEV | 05/27/2020 11:31 a.m. | bilkat | 396 | 9 |
alignment_bucket11_runByRun_v1 | 1132 | ✘ | Advanced run-by-run alignment (incl.PXD sensors) for bucket 11: BeamSpot+VXD+CDC |
OPEN | DEV | 05/30/2020 5:43 p.m. | bilkat | 738 | 9 |
alignment_misalignment-like-data_v1 | 1210 | ✘ | Realistic data-like misalignment for VXD and CDC - derived from data alignment payloads in 2019 (CDC wire-z positions reset) - is missing global z.shift of VXD |
TESTING | DEV | 07/07/2020 9:05 p.m. | bilkat | 2 | 2 |
staging_online_bilkat_20201030-181233 | 1386 | ✘ | CR DQM histograms with residuals bad for exp14 -> realignment needed |
OPEN | DEV | 10/30/2020 6:13 p.m. | bilkat | 2 | 2 |
alignment_newMagneticFieldNov2020_v1 | 1411 | ✘ | New magnetic field map from V.D.Thanh for alignment test |
TESTING | DEV | 11/17/2020 1:09 p.m. | bilkat | 1 | 1 |
alignment_bucket15_Aligned3 | 1531 | ✘ | As Aligned2Best but with IP-z free |
TESTING | DEV | 02/14/2021 6:13 p.m. | bilkat | 9 | 9 |
alignment_bucket15_Aligned4 | 1534 | ✘ | As Aligned2Best but with IP-xyz free |
TESTING | DEV | 02/15/2021 6:15 p.m. | bilkat | 9 | 9 |
alignment_proc12_chunk2_stage2 | 1667 | ✘ | Run-dep alignment each run (min 80k entries) using dimuons with IP constr(IP free) for chunk2 in proc12 |
TESTING | DEV | 05/07/2021 9:40 p.m. | bilkat | 676 | 2 |
alignment_mc13bfix | 1712 | ✘ | Added missing payloads to run cosmic simulation with MC13b prompt |
TESTING | DEV | 05/25/2021 10:50 a.m. | bilkat | 2 | 2 |
alignment_proc12stage1_part14_noHemiCon | 1793 | ✘ | Test of new alignment for part14 of proc12 stage1 NOT using hemisphere constraints for L55 |
TESTING | DEV | 06/17/2021 9:42 a.m. | bilkat | 2 | 2 |
alignment_proc12stage1part14_lxtest1 | 1799 | ✘ | Test two-body decays |
TESTING | DEV | 06/19/2021 7:02 a.m. | bilkat | 2 | 2 |
alignment_proc12stage1_part14_sag | 1800 | ✘ | proc12 part14 stage1 with wire sagging |
TESTING | DEV | 06/19/2021 8:14 p.m. | bilkat | 2 | 2 |