Questions? Write to T1 CDB team

GlobalTag: 68 items found         Click on items for more details


Name ID Default? Description Status Type Modified Mod. by Total Payloads Distinct Payloads
alignment_stage0_proc10_block-7-2734-8-349 749
Initial pre-alignment from zeros for proc10 for VXD + CDC (layers)
TESTING DEV 10/19/2019 9:58 a.m. tadeas 10 9
alignment_stage1_proc10 750
Starting alignment using verte-constrained decays. Still time-independent - the purpose is to now add Boff cosmics (should have been done ideally already at stage 0) and basic time dependence(stage2), then wire-by-wire alignment on top of that(stage3).
TESTING DEV 10/19/2019 4:57 p.m. tadeas 3 3
alignment_2019c_v2 765
Fixed alignment_2019c_v1 with vertex+beam constrained decays removed
TESTING DEV 11/05/2019 1:35 a.m. tadeas 2 2
alignment_reset_CDC 736
This GT contains CDC alignment reset to zeros (layers and wires x,y) and z-positions of wires inherited from older payloads(from survey)
TESTING DEV 10/08/2019 7:17 p.m. tadeas 1 1
alignment_2019c_v4 867
IP+VXD+CDC alignment for exp10, run-dep.
TESTING DEV 02/02/2020 2:41 a.m. tadeas 173 3
alignment_misalignment-like-data_v4 1218
(fixed broken v3) like v2, but with z-shift 0.5mm added to all VXD half-shells and average dphi for CDC layers reset to zero
TESTING DEV 07/09/2020 10:13 p.m. tadeas 2 2
alignment_realignment_bucket13wires_v1 1251
Realignment with wires of bucket13, iteration 2
TESTING DEV 07/30/2020 10:09 p.m. tadeas 78 3
alignment_resetBucket13wireAlignment 1233
Bucket13 CDC alignment with wires (xb,yb,xf,yf) set to 0.
TESTING DEV 07/19/2020 1:21 p.m. tadeas 1 1
alignment_wireMCChallenge_v3 1240
Wire misalignment taken from bucket13 (with layer radius fixed - just first iteration, >1000entries, constraints OK) + CDC layers and VXD taken from 6th iteration of prompt challenge with p-value cut
TESTING DEV 07/23/2020 10:30 p.m. tadeas 2 2
alignment_2020a_testing_v1 1096
First batch of run-by-run (large runs) alignment for VXD shells + PXD sensors, with CDC layer alignment (more granularity only in bucket9, others not yet fixed - one const CDC alignment. Includes BeamSpot alignment for selected runs. Two runs removed due to bug with missing constraint in first time interval - fixed for bucket 9, remaining for rest up to 2500 - no concern
OPEN DEV 05/15/2020 3:39 p.m. tadeas 1722 9
s 1230
iteration 2 of full global alignment (from zeros) including CDC wires
OPEN DEV 07/17/2020 7:21 p.m. tadeas 0 0
alignment_misalignment_VXDCDCwires_v1 1231
iteration 2 of full global alignment (from zeros) including CDC wires
TESTING DEV 07/17/2020 7:23 p.m. tadeas 2 2
alignment_BeamSpotFixYSize_v1 1241
reset IP position to 0. + set Y size to 2 um
TESTING DEV 07/25/2020 12:05 p.m. tadeas 1 1
alignment_testing_magnetOFF_e1003r1001-1999 1226
testing GT for alignment MC tests with combined magnet ON+OFF data
TESTING DEV 07/13/2020 7:29 p.m. tadeas 1 1
alignment_wireMCChallenge_v1 1235
Wire misalignment taken from bucket13 + CDC layers and VXD taken from 6th iteration of prompt challenge with p-value cut
TESTING DEV 07/21/2020 9:26 p.m. tadeas 2 2
alignment_promptChallenge_v4_nocut_iter5 1219
result of MC test of prompt alignment of alignment_misalignment-like-data_v4, iteration 5, with no cut on input track quality
TESTING DEV 07/10/2020 2:45 p.m. tadeas 2 2
alignment_2020a_testing_v2 1100
First batch of run-by-run (large runs) alignment for VXD shells + PXD sensors, with CDC layer alignment (more granularity only in bucket9, others not yet fixed - one const CDC alignment. Includes BeamSpot alignment for selected runs. Two runs removed due to bug with missing constraint in first time interval - fixed for bucket 9, remaining for rest up to 2500 - no concern. Fixed 2500-3000 run range
OPEN DEV 05/16/2020 10:17 a.m. tadeas 1491 9
alignment_misalignment-like-data_v2 1213
Similar to alignment_misalignment-like-data_v1, but VXD sensors moved to constraints' reference system and extracted to get global misalignment of half-shells
TESTING DEV 07/08/2020 8:30 p.m. tadeas 2 2
alignment_misalignment-like-data_v3 1217
like v2, but with z-shift 0.5mm added to all VXD half-shells and average dphi for CDC layers reset to zero
TESTING DEV 07/09/2020 10:03 p.m. tadeas 2 2
alignment_bucket14_it2_withPvalCut 1220
Manual bucket 14 result
TESTING DEV 07/11/2020 2:10 p.m. tadeas 2 2
alignment_wireMCChallenge_v2 1236
Wire misalignment taken from bucket13 (with layer radius fixed) + CDC layers and VXD taken from 6th iteration of prompt challenge with p-value cut
TESTING DEV 07/22/2020 8:14 a.m. tadeas 2 2
s-proc_bucket15_VXDCDCAlignment_fixed 1415
Special processing for bucket15 alignment - manually fixed for low stat runs - to be uploaded to Airflow
TESTING DEV 11/25/2020 7:12 p.m. tadeas 87 2
alignment_resetCDCwires_bucket14 1370
Copy CDCAlignment revision 119 (bucket14) with wire alignment(xb,yb,xf,yf) set to zero
TESTING DEV 10/21/2020 3:11 p.m. tadeas 1 1
alignment_realisticCDCWireMisalignment13Jan2020 1472
Realistic alignment (only) for wires extracted from data
TESTING DEV 01/13/2021 11:02 a.m. tadeas 1 1
alignment_2019c_v3_from3507 853
IP+VXD+CDC alignment, IP+halfshells run-by-run(large runs), sensors+CDClayers once, from run 3507 to run 5896, but last IoVs left open
TESTING DEV 01/13/2020 5:51 p.m. tadeas 165 3