Questions? Write to T1 CDB team

GlobalTag: 3204 items found         Click on items for more details


Name ID Default? Description Status Type Modified Mod. by Total Payloads Distinct Payloads
AIRFLOW_online_snapshot_20191207-080929 821
This is the official GT operating online
TESTING DEV 12/07/2019 8:10 a.m. chunhua 776 401
user_dvthanh_sigmaFF_trial_1.0 3236
Fudge factor 1.0 for trial
TESTING DEV 03/16/2024 10:24 a.m. dvthanh 1 1
alignment_proc10_baselineOct28 755
New baseline alignment for proc10 using Bon+physics data after quench
TESTING DEV 10/28/2019 11:41 a.m. bilkat 3 3
temp_main_zlebcr_20221011-155242 2701
New payload required by BII-8489
TESTING DEV 10/11/2022 4:07 p.m. zlebcr 1 1
mc_production_CDCTrigger_exp24_26 2636
GT needed for MC15rd, including proper CDCTRG deadchannel corresponding to exp24-26
TESTING DEV 08/09/2022 8:14 a.m. amartini 38 1
test_photoneff_tag_v2 2747
tag for photon detection efficiency testing
TESTING DEV 11/07/2022 6:21 p.m. hsvidras 1 1
test_gt_tracksf_v0 1949
Test GT for the track momentum scale factors
TESTING DEV 02/14/2022 3:41 p.m. nrad 14 9
KLid_BDT_weight 2339
weights for KLis BDT
TESTING DEV 02/17/2022 4:19 p.m. passeri 4 4
AIRFLOW_final_staging_DEV_calibration_reprocessing 3057
Used for the airflow development server (do not use for production)
TESTING DEV 03/26/2024 4:03 a.m. ddossett 0 0
bilka_proc10_VXDCDCT0_i0_v1 723
First iteration for VXD+CDC+T0
TESTING DEV 09/30/2019 6:08 p.m. bilkat 30 9
AIRFLOW_data_staging_calibration_reprocessing 1925
The staging tag used by Airflow for the reprocessing of data
TESTING DEV 04/25/2024 4:15 a.m. ddossett 12 2
ft_hbpipi_mva 2637
weightfile for BDTClassifier tracks selection for hbpipi analysis
TESTING DEV 08/10/2022 2:40 p.m. ftesta 3 3
svd_LS1_noFADCMaskedStrips 2540
GT contaning SVDFADCMaskedStrips payload with NO strips masked, to be used for the simulation of a perfect detector
TESTING DEV 06/22/2022 10:26 a.m. casarosa 1 1
leptonid_Moriond2022_Official_rel5_v2__EFF_jpsill_FR_combination 2346
Lepton ID Data/MC corrections, based on the full 190 /fb Moriond 2022 DS - Efficiency corrections based on **J/psi->ll** channel only - fixed threshold working points (>0.5, 0.9, 0.95, likelihood LID only) and uniform efficiency working points (60,70,80,90, 95%, both likelihood and BDT LID).
TESTING DEV 02/24/2022 1:45 a.m. mmilesi 130 130
CDCdEdx_resetCell_rel06 1994
empty reset 1D and 2D with new bins
TESTING DEV 09/17/2021 7:54 p.m. jikumar 1 1
leptonid_Moriond2022_Official_rel5_v1 2226
Lepton ID Data/MC corrections, based on 127 1/fb (~66%) of the Moriond 2022 DS - fixed threshold working points (>0.5, 0.9, 0.95, likelihood LID only) and uniform efficiency working points (60,70,80,90%, both likelihood and BDT LID).
TESTING DEV 02/24/2022 12:45 a.m. mmilesi 156 156
svd_test_CoG3forRelease06 1763
new CoG3 MC calibrations for release-06
TESTING DEV 06/14/2021 1 p.m. casarosa 2 1
top_staging_bucket22_local 1856
Staging Gt for TOP local calibrations in bucket22
TESTING DEV 06/25/2021 10:51 a.m. skohani 3 3
svd_LS1_maskedL3 2541
GT contaning SVDFADCMaskedStrips payload with all strips of L3 masked
TESTING DEV 06/22/2022 10:44 a.m. casarosa 1 1
upgrade_2021-07-16_vtx_7layer 1912
Development GT for Belle II w/o PXD+SVD and w/ 7 layer VTX
TESTING DEV 07/16/2021 1:04 p.m. benni 19 10
mc_production_MC00rd_exp00_bucket03 1928
Tag for run-dependent MC production
TESTING DEV 07/27/2021 12:11 p.m. basf2 9 7
alignment_s-proc2_test1_stage1 1968
Test of s-proc2 realignment for bucket25 - stage1
TESTING DEV 08/27/2021 9:06 a.m. bilkat 6 6
beamRelatedParameters_off4S_MC15ri 2702
Beam related payloads for the off-resonance run-independent MC15, based on release-06-00-07
TESTING DEV 10/12/2022 6:47 p.m. zlebcr 4 4
svd_LS1_maskedL3Side0 2780
GT contaning SVDFADCMaskedStrips payload with L3 side0 masked
TESTING DEV 12/03/2022 11:26 a.m. jrehman 1 1
svd_LS1_L342 2728
GT contaning payload with L342 masked, to be used for the simulation of a L342 masked detector
TESTING DEV 11/02/2022 8:48 a.m. jrehman 1 1