|
Name | ID | Default? | Description | Status | Type | Modified | Mod. by | Total Payloads | Distinct Payloads |
---|---|---|---|---|---|---|---|---|---|
staging_online_nkzwjp_20220217-150608 | 2337 | ✘ | Online tag for beginning of exp 24 |
OPEN | DEV | 02/17/2022 3:06 p.m. | nkzwjp | 6 | 6 |
staging_online_remnev_20220217-034048 | 2336 | ✘ | Update of ECL energy thresholds based on newest energy calibrations |
OPEN | DEV | 02/17/2022 3:41 a.m. | remnev | 2 | 2 |
mc_production_MC15rd_a_exp21_bucket27 | 2335 | ✘ | Tag for run-dependent MC production |
PUBLISHED | DEV | 09/24/2022 3:40 p.m. | basf2 | 148 | 34 |
mc_production_MC15rd_a_exp21_bucket27_STAGING | 2334 | ✘ | Tag for run-dependent MC production |
TESTING | DEV | 07/07/2022 3:14 p.m. | basf2 | 113 | 7 |
staging_main_nkzwjp_20220215-064720 | 2333 | ✘ | To add PS for exp24. To fix wrong PS of stt4 and stt5 for 2021 runs (exp20,21,22). |
OPEN | DEV | 02/15/2022 6:47 a.m. | nkzwjp | 139 | 6 |
staging_main_nkzwjp_20220215-062201 | 2332 | ✘ | To add PS values for exp24. To fix wrong PS values for stt4 and stt5 for 2021c runs. |
OPEN | DEV | 02/15/2022 6:22 a.m. | nkzwjp | 139 | 6 |
flavor_tagging_MC14_light_2110_woBDTLID | 2331 | ✘ | global tag with flavor tagger weight files optimized for MC14 with light-2110 |
TESTING | DEV | 02/14/2022 6:09 a.m. | yosato | 15 | 15 |
temp_main_depietro_20220210-164855 | 2330 | ✘ | — | OPEN | DEV | 02/10/2022 4:49 p.m. | depietro | 1 | 1 |
staging_online_gdujany_20220210-104124 | 2329 | ✘ | Update SVD payloads |
OPEN | DEV | 02/10/2022 10:41 a.m. | gdujany | 7 | 7 |
final_w_cc_B2Dh | 2328 | ✘ | info |
TESTING | RELEASE | 02/07/2022 10:10 a.m. | tiacrane | 2 | 2 |
beam_bg_sim_fullVXD_snowmass_03mm_belle2-beast2_farbeamline | 2327 | ✘ | Phase3 (full VXD) Belle II + Beast II within the IR+FarBeamline (|s|<29m). Geometry payloads for the beam-induced background simulation. It requires some modifications of the Belle II sub-system settings (study). For now, the Beast II system is not present in DB so its geometry is built from the XML file. Used for the Snowmass beta*y=0.3mm optics. |
TESTING | DEV | 02/05/2022 7:39 a.m. | anatochi | 20 | 20 |
beam_bg_sim_fullVXD_snowmass_06mm_nlc_belle2-beast2_farbeamline | 2326 | ✘ | Phase3 (full VXD) Belle II + Beast II within the IR+FarBeamline (|s|<29m). Geometry payloads for the beam-induced background simulation. It requires some modifications of the Belle II sub-system settings (study). For now, the Beast II system is not present in DB so its geometry is built from the XML file. Used for the Snowmass beta*y=0.6mm optics with a non-linear collimator (NLC). |
TESTING | DEV | 02/04/2022 11:08 p.m. | anatochi | 20 | 20 |
staging_validation_remnev_20220202-074755 | 2325 | ✘ | Since release-07, ECLDigitizer module for the simulation will use parameters from ConditionsDB instead of local files from the repository. |
OPEN | DEV | 02/02/2022 7:48 a.m. | remnev | 3 | 3 |
staging_main_remnev_20220202-073910 | 2324 | ✘ | Since release-07, ECLDigitizer module for the simulation will use parameters from ConditionsDB instead of local files from the repository. |
OPEN | DEV | 02/02/2022 7:39 a.m. | remnev | 3 | 3 |
performance_mc14rd_bucket16 | 2323 | ✘ | performance and beam related payloads for bucket16 |
TESTING | DEV | 02/02/2022 8:16 a.m. | merola | 10 | 1 |
beam_bg_sim_fullVXD_snowmass_06mm_belle2-beast2_farbeamline | 2322 | ✘ | Phase3 (full VXD) Belle II + Beast II within the IR+FarBeamline (|s|<29m). Geometry payloads for the beam-induced background simulation. It requires some modifications of the Belle II sub-system settings (study). For now, the Beast II system is not present in DB so its geometry is built from the XML file. Used for the Snowmass beta*y=0.6mm optics. |
TESTING | DEV | 02/01/2022 6:50 a.m. | anatochi | 20 | 20 |
mc_production_MC14rd_e_exp18_bucket22 | 2321 | ✘ | Tag for run-dependent MC production |
TESTING | DEV | 01/31/2022 7:28 p.m. | basf2 | 254 | 45 |
mc_production_MC14rd_e_exp18_bucket21 | 2320 | ✘ | Tag for run-dependent MC production |
TESTING | DEV | 01/31/2022 7:22 p.m. | basf2 | 224 | 45 |
beam_bg_sim_partialVXD_snowmass_08mm_belle2-beast2_farbeamline | 2319 | ✘ | Early Phase3 (partial VXD) Belle II + Beast II within the IR+FarBeamline (|s|<29m). Geometry payloads for the beam-induced background simulation. It requires some modifications of the Belle II sub-system settings (study). For now, the Beast II system is not present in DB so its geometry is built from the XML file. Used for the Snowmass beta*y=0.8mm optics. |
TESTING | DEV | 01/29/2022 11:28 p.m. | anatochi | 19 | 19 |
proc12_chunk2_off2_mcBeamParams | 2318 | ✘ | Proc12 chunk2 off-resonance (5513 - 5736) Beam parameters payloads for time-dep MC |
OPEN | DEV | 01/28/2022 3:52 p.m. | zlebcr | 30 | 4 |
proc12_chunk2_off1_mcBeamParams | 2317 | ✘ | Proc12 chunk2 off-resonance (3973 - 4191) Beam parameters payloads for time-dep MC |
OPEN | DEV | 01/28/2022 3:52 p.m. | zlebcr | 25 | 4 |
CollisionEnergy_proc12_chunk2_off | 2316 | ✘ | Collision invariant mass payloads for proc12 chunk2 off-resonance data |
TESTING | DEV | 01/28/2022 2:14 p.m. | zlebcr | 2 | 1 |
BoostVector_proc12_chunk2_off | 2315 | ✘ | Boost Vector payloads for proc12 chunk2 off-resonance data |
TESTING | DEV | 01/28/2022 2:13 p.m. | zlebcr | 208 | 1 |
main_2022-01-27 | 2314 | ✘ | Software Development and Testing Tag
This global tag containing necessary payloads for testing of the software and
experiment independent MC. It cannot be used to analyze data and only contains
payloads for the following intervals of validity:
- exp 0: nominal Belle II Configuration with full PXD (full phase 3)
- exp 1002: Phase 2 Configuration with minimal vertexing detectors and
additional background detectors
- exp 1003: Belle II Configuration with partial PXD (early phase 3)
Previous global tag: main_2022-01-14
Changes are collected in Pull request #664, see https://stash.desy.de/projects/B2/repos/basf2/pull-requests/664 |
PUBLISHED | RELEASE | 05/13/2022 7:37 a.m. | tuppr_ware | 406 | 364 |
leptonid_Moriond2022_Official_rel5_v1a | 2313 | ✘ | Lepton ID Data/MC corrections, based on 127 1/fb (~66%) of the Moriond 2022 DS - fixed threshold working points (>0.5, 0.9, 0.95, likelihood LID only) and uniform efficiency working points (60,70,80,90, 95%, both likelihood and BDT LID). Only difference wrt/ v1 is a new naming scheme for likelihood-based PID variables, to show explictly which subdetectors are excluded (if any). |
VALIDATED | DEV | 02/24/2022 12:46 a.m. | mmilesi | 130 | 130 |