|
Name | ID | Default? | Description | Status | Type | Inserted | Modified | Mod. by | Total Payloads | Distinct Payloads |
---|---|---|---|---|---|---|---|---|---|---|
extraprompt_to_proc10 | 832 | ✘ | extra payloads for proc10, those were not proc10 calibration |
TESTING | DEV | 12/14/2019 5:50 p.m. | 12/14/2019 11:02 p.m. | jikumar | 74 | 41 |
ECL_configuration | 831 | ✘ | Payloads with ECL electronics configuration. Channel mapping, energy thresholds, attenuator coefficients and, potentially, values of several important registers. |
TESTING | DEV | 12/13/2019 6:11 p.m. | 09/29/2021 10:56 a.m. | remnev | 265 | 6 |
AIRFLOW_data_reprocessing_prompt_snapshot_20191213-043907 | 830 | ✔ | running GT for the first (prompt) reprocessing |
TESTING | RELEASE | 12/13/2019 4:39 a.m. | 12/13/2019 4:43 a.m. | ddossett | 24562 | 277 |
data_reprocessing_proc10clone | 829 | ✘ | Staging global tag for the major reprocessings |
VALIDATED | DEV | 12/12/2019 9:22 p.m. | 12/12/2019 9:35 p.m. | tamponi | 14678 | 125 |
data_reprocessing_prompt_backup | 828 | ✔ | running GT for the first (prompt) reprocessing |
OPEN | RELEASE | 12/12/2019 8:19 p.m. | 12/12/2019 8:19 p.m. | tamponi | 24501 | 269 |
data_reprocessing_proc10_bk | 827 | ✘ | Staging global tag for the major reprocessings |
OPEN | DEV | 12/12/2019 8:17 p.m. | 12/12/2019 8:18 p.m. | tamponi | 9605 | 105 |
mva_belle_sigma | 826 | ✘ | Sigma+ selection using BDT on Belle MC and data |
OPEN | DEV | 12/10/2019 7:55 p.m. | 12/10/2019 11:48 p.m. | dazhi | 1 | 1 |
ECL_timing_preProc10_fixingIOV_v01 | 825 | ✘ | Proc 10 ECL timing calibration constants. IOV not yet fixed. |
OPEN | DEV | 12/09/2019 4:34 p.m. | 12/09/2019 4:34 p.m. | ehill | 1301 | 2 |
carlos_test12_2019 | 824 | ✘ | test create tag |
OPEN | DEV | 12/09/2019 4:01 p.m. | 12/09/2019 4:06 p.m. | cgamboa | 0 | 0 |
test_stagingGT | 823 | ✘ | staging test GT to hold temp payloads |
OPEN | DEV | 12/08/2019 2:31 a.m. | 12/08/2019 2:31 a.m. | jikumar | 1 | 1 |
mva_belle_lamdba_release-03-02-04 | 822 | ✘ | mva based lambda selection for belle base on release-03-2-04 |
OPEN | DEV | 12/07/2019 8:44 p.m. | 12/07/2019 8:44 p.m. | dazhi | 0 | 0 |
AIRFLOW_online_snapshot_20191207-080929 | 821 | ✘ | This is the official GT operating online |
TESTING | DEV | 12/07/2019 8:09 a.m. | 12/07/2019 8:10 a.m. | chunhua | 776 | 401 |
ECL_timing_preProc10_IOVholes | 820 | ✘ | Proc 10 ECL timing calibration constants. IOV not yet fixed. |
OPEN | DEV | 12/07/2019 1:46 a.m. | 12/07/2019 1:46 a.m. | ehill | 1301 | 2 |
AIRFLOW_online_snapshot_20191207-012117 | 819 | ✘ | This is the official GT operating online |
TESTING | DEV | 12/07/2019 1:16 a.m. | 12/07/2019 1:44 a.m. | ddossett | 776 | 401 |
staging_analysis_uenot_20191206-053217 | 818 | ✘ | the previous payloads for Pi0EtaVeto tool is optimized for MC9. New payloads should be prepared for the current situation and needed to be selected in order to inclease background tolerance. |
OPEN | DEV | 12/06/2019 5:32 a.m. | 12/06/2019 5:32 a.m. | uenot | 8 | 8 |
staging_analysis_sutclw_20191205-135106 | 817 | ✘ | Inclusion of the release-03-01-01 MC12 early phase III FEI training in the analysis global tag. This will be superseded by a MC13 release 4 FEI training in the future. |
OPEN | DEV | 12/05/2019 1:51 p.m. | 12/05/2019 1:51 p.m. | sutclw | 206 | 206 |
test_chargedpidmva_Dec2019_v0 | 816 | ✘ | Charged PID MVA (BDTG) payloads for testing. Both for binary/multiclass lepton ID |
OPEN | DEV | 12/04/2019 2:56 a.m. | 10/13/2022 5:14 a.m. | mmilesi | 11 | 8 |
validation_2019-11-29 | 815 | ✘ | for software validation on data |
TESTING | DEV | 12/02/2019 7:55 p.m. | 03/10/2020 3:43 a.m. | jikumar | 307 | 212 |
staging_validation_luka_20191202-131945 | 814 | ✘ | these are new payloads for arich aerogel tiles alignment (after tuppr-gt-update-master_2019-11-29 is merged) |
OPEN | DEV | 12/02/2019 1:20 p.m. | 12/02/2019 1:20 p.m. | luka | 2 | 2 |
klm_alignment_testing | 813 | ✘ | GT containing only KLM alignment and displacement payloads --- Only for testing purposes |
OPEN | DEV | 12/02/2019 5:40 a.m. | 05/12/2021 8:58 a.m. | depietro | 11 | 9 |
sdr_copy | 812 | ✘ | Staging global tag for the major reprocessings |
TESTING | DEV | 12/02/2019 1:25 a.m. | 12/02/2019 1:27 a.m. | jikumar | 5106 | 28 |
master_2019-11-29 | 811 | ✔ | Software Development and Testing Tag
This global tag containing necessary payloads for testing of the software and
experiment independent MC. It cannot be used to analyze data and only contains
payloads for the following intervals of validity:
- exp 0: nominal Belle II Configuration with full PXD (full phase 3)
- exp 1002: Phase 2 Configuration with minimal vertexing detectors and
additional background detectors
- exp 1003: Belle II Configuration with partial PXD (early phase 3)
Previous global tag: master_2019-11-11
Changes are collected in Pull request #5320, see https://stash.desy.de/projects/B2/repos/software/pull-requests/5320 |
PUBLISHED | RELEASE | 11/29/2019 1:14 p.m. | 12/16/2019 3:40 p.m. | tuppr_ware | 357 | 319 |
clone-online-20191129-fortest-novalidated | 810 | ✘ | a test gt, not validated |
OPEN | DEV | 11/29/2019 12:11 p.m. | 11/29/2019 12:12 p.m. | chunhua | 776 | 401 |
clone-online-20191129 | 809 | ✘ | clone of gt online on Nov.29,2019 |
OPEN | DEV | 11/29/2019 12:09 p.m. | 11/29/2019 12:11 p.m. | chunhua | 769 | 401 |
staging_master_mapr_20191129-061654 | 808 | ✘ | The previous updates of the software trigger were created standalone. The software_trigger_cut&filter does not include the information in an incremental way. In the latest revision only the changes of the latest request are included. This request fixes this. |
OPEN | DEV | 11/29/2019 6:17 a.m. | 11/29/2019 6:17 a.m. | mapr | 5 | 5 |