Questions? Write to T1 CDB team

Comparison of Global Tags. Specify a pair of IDs or a pair of names.

⇐      Specify the tags to compare      ⇒

Global Tags

Name ID Default? Description Status Type Inserted Modified Mod. by Total Payloads Distinct Payloads
AIRFLOW_online_snapshot_20200726-061015 1243
This is the official GT operating online
TESTING DEV 07/26/2020 6:11 a.m. 07/26/2020 6:11 a.m. chunhua 872 416
AIRFLOW_TEST_data_staging_calibration_prompt_bucket14_backup 1242
A test area for development on airflow production. Used as a test staging GT so we don't interfere with the actual production one.
OPEN DEV 07/25/2020 1:27 p.m. 07/25/2020 1:27 p.m. ddossett 2009 47
alignment_BeamSpotFixYSize_v1 1241
reset IP position to 0. + set Y size to 2 um
TESTING DEV 07/25/2020 12:04 p.m. 07/25/2020 12:05 p.m. tadeas 1 1
alignment_wireMCChallenge_v3 1240
Wire misalignment taken from bucket13 (with layer radius fixed - just first iteration, >1000entries, constraints OK) + CDC layers and VXD taken from 6th iteration of prompt challenge with p-value cut
TESTING DEV 07/23/2020 10:30 p.m. 07/23/2020 10:30 p.m. tadeas 2 2
a_goat_version_of_proc11 1239
Basically data_reprocessing_proc11, but for goats.
OPEN DEV 07/23/2020 2:44 p.m. 07/23/2020 2:44 p.m. depietro 19089 234
fixed_klongID_for_proc11 1238
Global Tag containing the correct version of KlongID payload for proc11 reprocessing
TESTING DEV 07/23/2020 10:27 a.m. 07/26/2020 7:44 a.m. depietro 1 1
1237_COPY-OF_carlos_test 1237
test tag creation
OPEN DEV 07/22/2020 3:17 p.m. 07/22/2020 3:17 p.m. TEST USER 4 4
alignment_wireMCChallenge_v2 1236
Wire misalignment taken from bucket13 (with layer radius fixed) + CDC layers and VXD taken from 6th iteration of prompt challenge with p-value cut
TESTING DEV 07/22/2020 8:13 a.m. 07/22/2020 8:14 a.m. tadeas 2 2
alignment_wireMCChallenge_v1 1235
Wire misalignment taken from bucket13 + CDC layers and VXD taken from 6th iteration of prompt challenge with p-value cut
TESTING DEV 07/21/2020 9:23 p.m. 07/21/2020 9:26 p.m. tadeas 2 2
leptonid_ICHEP2020_Official_v0 1234
Lepton ID Data/MC corrections - proc11+prompt/MC13a
TESTING DEV 07/20/2020 4:58 a.m. 07/20/2020 5:01 a.m. mmilesi 18 18
alignment_resetBucket13wireAlignment 1233
Bucket13 CDC alignment with wires (xb,yb,xf,yf) set to 0.
TESTING DEV 07/19/2020 1:20 p.m. 07/19/2020 1:21 p.m. tadeas 1 1
val_CDCdEdx_bucket14 1232
validating CDC dEDx calibration for bucket14
PUBLISHED DEV 07/17/2020 8:43 p.m. 04/11/2021 12:50 a.m. jikumar 237 3
alignment_misalignment_VXDCDCwires_v1 1231
iteration 2 of full global alignment (from zeros) including CDC wires
TESTING DEV 07/17/2020 7:22 p.m. 07/17/2020 7:23 p.m. tadeas 2 2
s 1230
iteration 2 of full global alignment (from zeros) including CDC wires
OPEN DEV 07/17/2020 7:21 p.m. 07/17/2020 7:21 p.m. tadeas 0 0
staging_master_jikumar_20200717-053024 1229
adding new payload data based CDC dE/dx calibartion and no effect on MC
OPEN DEV 07/17/2020 5:31 a.m. 07/17/2020 5:31 a.m. jikumar 2 2
staging_master_jikumar_20200717-052124 1228
adding new payload data based CDC dE/dx calibartion and no effect on MC
OPEN DEV 07/17/2020 5:22 a.m. 07/17/2020 5:22 a.m. jikumar 2 2
mc_production_MC13b_prompt 1227
GT for run-dependent MC13b corresponding to prompt processing
TESTING RELEASE 07/16/2020 3:01 p.m. 07/16/2020 3:24 p.m. jbennett 24 21
alignment_testing_magnetOFF_e1003r1001-1999 1226
testing GT for alignment MC tests with combined magnet ON+OFF data
TESTING DEV 07/13/2020 7:28 p.m. 07/13/2020 7:29 p.m. tadeas 1 1
mc_production_MC13b_bucket12 1225
GT for run-dependent MC13b corresponding to bucket12
OPEN RELEASE 07/13/2020 2:29 p.m. 07/13/2020 2:29 p.m. jbennett 6 6
upgrade_2020-07-13_vtx_5layer_discs 1224
Development GT for Belle II w/o PXD+SVD and w/ 5 layer VTX with discs
TESTING DEV 07/13/2020 12:35 p.m. 07/13/2020 12:36 p.m. benni 10 5
cdc_mc_v1 1223
cdc constants for mc study v1
TESTING DEV 07/12/2020 4:56 a.m. 07/26/2020 4 a.m. uchida 5 5
CDCdEdxADCNonL 1222
new GT for ADC correction
TESTING DEV 07/12/2020 3:10 a.m. 07/17/2020 3:49 a.m. jikumar 2 2
upgrade_2020-07-11_vtx_7layer 1221
Development GT for Belle II w/o PXD+SVD and w/ 7 layer VTX
TESTING DEV 07/11/2020 4:59 p.m. 07/11/2020 4:59 p.m. benni 14 5
alignment_bucket14_it2_withPvalCut 1220
Manual bucket 14 result
TESTING DEV 07/11/2020 2:09 p.m. 07/11/2020 2:10 p.m. tadeas 2 2
alignment_promptChallenge_v4_nocut_iter5 1219
result of MC test of prompt alignment of alignment_misalignment-like-data_v4, iteration 5, with no cut on input track quality
TESTING DEV 07/10/2020 2:44 p.m. 07/10/2020 2:45 p.m. tadeas 2 2