|
Name | ID | Default? | Description | Status | Type | Inserted | Modified | Mod. by | Total Payloads | Distinct Payloads |
---|---|---|---|---|---|---|---|---|---|---|
svd_LS1_maskedL3Lad34Side0 | 2782 | ✘ | GT contaning SVDFADCMaskedStrips payload with L3 side0 masked |
TESTING | DEV | 12/03/2022 11:55 a.m. | 12/03/2022 noon | jrehman | 1 | 1 |
top_staging_bucket30_local | 2379 | ✘ | Staging Gt for TOP bucket30 local calibration |
TESTING | DEV | 03/18/2022 7:07 p.m. | 03/18/2022 7:18 p.m. | skohani | 5 | 5 |
svd_LS1_L341 | 2727 | ✘ | GT contaning payload with L341 masked, to be used for the simulation of a L341 masked detector |
TESTING | DEV | 11/02/2022 8:38 a.m. | 11/02/2022 8:41 a.m. | jrehman | 1 | 1 |
AIRFLOW_data_staging_calibration_prompt | 1596 | ✘ | Used as a test staging GT so we don't interfere with the actual production one. |
TESTING | DEV | 03/26/2021 2:19 a.m. | 05/15/2024 2:20 p.m. | ddossett | 935 | 16 |
alignment_bucket36_stage2_manual | 2620 | ✘ | Manualy created stage2 due to crash in software |
TESTING | DEV | 07/27/2022 9:02 a.m. | 07/27/2022 9:32 a.m. | bilkat | 186 | 6 |
BoostVector_proc12_chunk2_off | 2315 | ✘ | Boost Vector payloads for proc12 chunk2 off-resonance data |
TESTING | DEV | 01/28/2022 1:35 p.m. | 01/28/2022 2:13 p.m. | zlebcr | 208 | 1 |
CollisionEnergy_proc12_chunk2_off | 2316 | ✘ | Collision invariant mass payloads for proc12 chunk2 off-resonance data |
TESTING | DEV | 01/28/2022 2:07 p.m. | 01/28/2022 2:14 p.m. | zlebcr | 2 | 1 |
beam_bg_sim_20210616_early-phase3_belle2-beast2_farbeamline_modified_shielding | 1908 | ✘ | Early Phase3 Belle II + Beast II within the IR+FarBeamline (|s|<26m). Geometry payloads for the beam-induced background simulation. It requires some modifications of the Belle II sub-system settings (study). For now, the Beast II system is not present in DB so its geometry is built from the XML file. Tested with the master_2021-06-28 branch. + Modified shielding around Belle II, better geometry implementation |
TESTING | DEV | 07/15/2021 6:59 a.m. | 07/15/2021 7:02 a.m. | anatochi | 19 | 19 |
AIRFLOW_data_staging_localcalib_sproc4 | 2794 | ✘ | Staging tag for local calibrations in sproc4. |
TESTING | DEV | 12/07/2022 11:05 a.m. | 12/15/2022 10:26 p.m. | ddossett | 14 | 11 |
leptonid_EPS2021_Official_rel4_v7 | 1942 | ✘ | Lepton ID Data/MC corrections - rel4 - fixed threshold working points (>0.5, 0.9, 0.95), likelihood LID only |
TESTING | DEV | 08/04/2021 6:35 a.m. | 08/04/2021 6:36 a.m. | mmilesi | 30 | 30 |
staging_main_nkzwjp_20221014-202010 | 2708 | ✘ | trggdl payloads up to e26. |
TESTING | DEV | 10/14/2022 8:20 p.m. | 11/14/2022 5:13 p.m. | nkzwjp | 120 | 5 |
beam_bg_sim_partialVXD_snowmass_08mm_belle2-beast2_farbeamline | 2319 | ✘ | Early Phase3 (partial VXD) Belle II + Beast II within the IR+FarBeamline (|s|<29m). Geometry payloads for the beam-induced background simulation. It requires some modifications of the Belle II sub-system settings (study). For now, the Beast II system is not present in DB so its geometry is built from the XML file. Used for the Snowmass beta*y=0.8mm optics. |
TESTING | DEV | 01/29/2022 11:26 p.m. | 01/29/2022 11:28 p.m. | anatochi | 19 | 19 |
mc_production_MC14rd_e_exp18_bucket21 | 2320 | ✘ | Tag for run-dependent MC production |
TESTING | DEV | 01/31/2022 7:13 p.m. | 01/31/2022 7:22 p.m. | basf2 | 224 | 45 |
mc_production_MC14rd_e_exp18_bucket22 | 2321 | ✘ | Tag for run-dependent MC production |
TESTING | DEV | 01/31/2022 7:23 p.m. | 01/31/2022 7:28 p.m. | basf2 | 254 | 45 |
staging_data_reprocessing_proc13_chunk4_update_v2 | 2617 | ✘ | staging tag to upload all the merged payloads to copy into the proc13 official tag for chunk4 (exp16, 17) update |
TESTING | DEV | 07/27/2022 6:10 a.m. | 07/28/2022 7:45 a.m. | zani | 4119 | 262 |
alignment_bucket19_prompt_with_CDC_deform_v1 | 2427 | ✘ | Recalculated prompt baseline alignment of bucket19 with artificially defomed CDC endplates |
TESTING | DEV | 05/02/2022 2:33 p.m. | 05/02/2022 2:34 p.m. | bilkat | 6 | 6 |
data_reprocessing_proc12_chunk2_TEST_notToUse | 1774 | ✘ | final merged and validated GT after proc12_chunk1 completion.To be used as baseline for proc12_chunk2 instance. |
TESTING | DEV | 06/13/2021 11:51 a.m. | 06/14/2021 2:19 p.m. | zani | 13946 | 253 |
staging_master_casarosa_20210629-152722 | 1879 | ✘ | new payload |
TESTING | DEV | 06/29/2021 3:27 p.m. | 06/29/2021 6:15 p.m. | casarosa | 2 | 2 |
alignment_bucket19_stage1_with_CDC_deform_v1 | 2428 | ✘ | Stage1 for bucket19 test with artifically deformed CDC |
TESTING | DEV | 05/02/2022 4:13 p.m. | 05/02/2022 4:14 p.m. | bilkat | 6 | 6 |
ECL_configuration | 831 | ✘ | Payloads with ECL electronics configuration. Channel mapping, energy thresholds, attenuator coefficients and, potentially, values of several important registers. |
TESTING | DEV | 12/13/2019 6:11 p.m. | 09/29/2021 10:56 a.m. | remnev | 265 | 6 |
dp_recon_release6_patch | 1881 | ✘ | a patch GT that holds new/updated payloads those are required to perform reconstruction on release 06. The main processing GTs data_reprocessing_X and online should be used in chain |
TESTING | DEV | 06/29/2021 11:03 p.m. | 09/30/2021 3:46 p.m. | jikumar | 17 | 17 |
beam_bg_sim_fullVXD_snowmass_06mm_belle2-beast2_farbeamline | 2322 | ✘ | Phase3 (full VXD) Belle II + Beast II within the IR+FarBeamline (|s|<29m). Geometry payloads for the beam-induced background simulation. It requires some modifications of the Belle II sub-system settings (study). For now, the Beast II system is not present in DB so its geometry is built from the XML file. Used for the Snowmass beta*y=0.6mm optics. |
TESTING | DEV | 02/01/2022 6:48 a.m. | 02/01/2022 6:50 a.m. | anatochi | 20 | 20 |
tracking_CDCCorrToThresholds_2.0 | 3104 | ✘ | CDCCorrToThresholds set to 2.0 |
TESTING | DEV | 11/03/2023 9:26 a.m. | 11/03/2023 9:32 a.m. | casarosa | 1 | 1 |
svd_test_SVDCoGOnlyPositionError | 1909 | ✘ | test new cluster position errors for CoGOnly |
TESTING | DEV | 07/15/2021 9:30 a.m. | 07/15/2021 9:32 a.m. | casarosa | 1 | 1 |
data_reprocessing_proc13_snapshotAt20220728 | 2621 | ✘ | final GT for the data recalibration with rel-06-00 for the 13th major reprocessing. Started Jan 2022 |
TESTING | DEV | 07/28/2022 noon | 07/28/2022 1:08 p.m. | zani | 35255 | 262 |