|
Name | ID | Default? | Description | Status | Type | Modified | Mod. by | Total Payloads | Distinct Payloads |
---|---|---|---|---|---|---|---|---|---|
staging_beam_proc11_correct | 1123 | ✘ | getting te right beam energy into proc11 |
OPEN | DEV | 05/25/2020 7:53 a.m. | tamponi | 14 | 1 |
staging_beam_proc11_legacy | 1122 | ✘ | getting te right beam energy into proc11 |
OPEN | DEV | 05/25/2020 7:53 a.m. | tamponi | 9 | 1 |
bucket11_local_top_ss | 1121 | ✘ | Staging tag for the TOP local calibrations to be used in the prompt calibration |
OPEN | DEV | 05/23/2020 9:46 a.m. | tamponi | 55 | 1 |
upgrade_2020-05-23_vtx_5layer | 1120 | ✘ | Development GT for Belle II w/o PXD+SVD and w/ 5 layer VTX |
TESTING | DEV | 05/23/2020 9:36 a.m. | benni | 7 | 3 |
AIRFLOW_online_snapshot_20200522-173003 | 1119 | ✘ | This is the official GT operating online |
TESTING | DEV | 05/22/2020 5:31 p.m. | chunhua | 848 | 414 |
data_reprocessing_prompt_bk_before_bucket10_merge | 1118 | ✔ | running GT for the first (prompt) reprocessing |
OPEN | RELEASE | 05/22/2020 3:35 p.m. | tamponi | 32507 | 297 |
1117_COPY-OF_data_reprocessing_prompt | 1117 | ✔ | running GT for the first (prompt) reprocessing |
OPEN | RELEASE | 05/22/2020 3:08 p.m. | tamponi | 0 | 0 |
online_bucket10 | 1116 | ✘ | This is the official GT operating online |
TESTING | DEV | 05/22/2020 7:47 a.m. | chunhua | 848 | 414 |
staging_for_bucket10 | 1115 | ✘ | A test area for development on airflow production. Used as a test staging GT so we don't interfere with the actual production one. |
TESTING | DEV | 05/22/2020 7:44 a.m. | ddossett | 2333 | 49 |
ECL_crystalTimeMergingTests | 1114 | ✘ | GT for testing the merging new ECL timing payloads |
TESTING | DEV | 03/28/2021 2:08 a.m. | ehill | 4 | 3 |
staging_data_reprocessing_prompt_bucket12 | 1113 | ✘ | Staging GT to collect all subsystem validated staging GTs for bucket 12 |
TESTING | DEV | 06/11/2020 5:38 p.m. | zani | 851 | 38 |
clone_online_20200521 | 1112 | ✘ | clone of gt online on 20200521 |
OPEN | DEV | 05/21/2020 3:43 a.m. | chunhua | 847 | 414 |
20200521_so_test | 1111 | ✘ | test staging_online on 20200521 |
OPEN | DEV | 06/22/2020 1:10 p.m. | chunhua | 2 | 2 |
staging_master_hearty_20200521-003819 | 1110 | ✘ | new payloads |
OPEN | DEV | 05/21/2020 12:38 a.m. | hearty | 5 | 4 |
val_CDCdEdx_bucket10 | 1109 | ✘ | validating airflow bucket 10 data |
PUBLISHED | DEV | 04/11/2021 12:49 a.m. | jikumar | 291 | 3 |
upgrade_2020-05-20_vtx_5layer | 1108 | ✘ | Development GT for Belle II w/o PXD+SVD and w/ 5 layer VTX |
TESTING | DEV | 05/20/2020 10:19 a.m. | benni | 6 | 3 |
upgrade_2020-05-20_vtx_7layer | 1107 | ✘ | Development GT for Belle II w/o PXD+SVD and w/ 7 layer VTX |
TESTING | DEV | 05/20/2020 10:15 a.m. | benni | 8 | 3 |
clone_online_20200520 | 1106 | ✘ | clone of gt online on 20200520 |
OPEN | DEV | 05/20/2020 2:56 a.m. | chunhua | 840 | 414 |
20200520_so_test | 1105 | ✘ | test the staging_online on May20,2020 |
TESTING | DEV | 05/21/2020 4:04 a.m. | chunhua | 7 | 7 |
staging_mc_taichiro_20200519-184343 | 1104 | ✘ | bug fix for short tracking |
OPEN | DEV | 05/19/2020 6:43 p.m. | taichiro | 58 | 5 |
staging_mc_taichiro_20200519-184228 | 1103 | ✘ | Bug fix for short tracking |
OPEN | DEV | 05/19/2020 6:42 p.m. | taichiro | 5 | 5 |
release-04-02-04 | 1102 | ✔ | Software Development and Testing Tag
This global tag containing necessary payloads for testing of the software and
experiment independent MC. It cannot be used to analyze data and only contains
payloads for the following intervals of validity:
- exp 0: nominal Belle II Configuration with full PXD (full phase 3)
- exp 1002: Phase 2 Configuration with minimal vertexing detectors and
additional background detectors
- exp 1003: Belle II Configuration with partial PXD (early phase 3)
Previous global tag: release-04-02-03
Changes are collected in Pull request #6268, see https://stash.desy.de/projects/B2/repos/software/pull-requests/6268 |
TESTING | RELEASE | 05/19/2020 6:49 a.m. | tuppr_ware | 352 | 320 |
CDCdEdx_proc11b_new1DCell | 1101 | ✘ | new 1D w/ wide truncation |
TESTING | DEV | 06/14/2020 1:36 a.m. | jikumar | 1 | 1 |
alignment_2020a_testing_v2 | 1100 | ✘ | First batch of run-by-run (large runs) alignment for VXD shells + PXD sensors, with CDC layer alignment (more granularity only in bucket9, others not yet fixed - one const CDC alignment. Includes BeamSpot alignment for selected runs. Two runs removed due to bug with missing constraint in first time interval - fixed for bucket 9, remaining for rest up to 2500 - no concern. Fixed 2500-3000 run range |
OPEN | DEV | 05/16/2020 10:17 a.m. | tadeas | 1491 | 9 |
bucket12_local_top_ss | 1099 | ✘ | Staging tag for the TOP local calibrations to be used in the prompt calibration |
OPEN | DEV | 05/16/2020 4:34 a.m. | tamponi | 13 | 1 |