Questions? Write to T1 CDB team

GlobalTag: 3204 items found         Click on items for more details


Name ID Default? Description Status Type Modified Mod. by Total Payloads Distinct Payloads
AIRFLOW_TEST_data_staging_calibration_prompt_snapshotAt20210521 1705
A test area for development on airflow production. Used as a test staging GT so we don't interfere with the actual production one.
OPEN DEV 05/21/2021 7:56 a.m. ddossett 5358 46
AIRFLOW_TEST_data_staging_calibration_prompt_snapshotAt20210613 1771
A test area for development on airflow production. Used as a test staging GT so we don't interfere with the actual production one.
OPEN DEV 06/13/2021 9:55 a.m. ddossett 14263 61
AIRFLOW_TEST_data_staging_calibration_prompt_snapshotAt20210614 1776
A test area for development on airflow production. Used as a test staging GT so we don't interfere with the actual production one.
OPEN DEV 06/14/2021 8:58 a.m. ddossett 14259 58
AIRFLOW_TEST_data_staging_localcalib_prompt 696
A test area for development on airflow production. Used as a place for local calibration staging payloads before being moved into the main staging GT.
TESTING DEV 05/15/2021 12:56 a.m. ddossett 94 20
AIRFLOW_TESTING_CALIBRATION 1152
Constantly changing this for testing prompt system
OPEN DEV 06/08/2020 7:14 a.m. ddossett 4 4
AIRFLOW_TESTING_STAGING_PROMPT 1150
A tag whose contents could be deleted at any moment. Just for testing the prompt system.
TESTING DEV 06/08/2020 8:51 a.m. ddossett 4 4
AIRFLOW_TEST_staging_calib_proposal 716
A working tag where modifications to the payloads are made often. Used to hold a copy of the staging payloads, which we then perform modifications on in order to try and remove problems(overlaps, gaps, etc).
OPEN DEV 09/26/2019 10:48 a.m. ddossett 0 0
AIRFLOW_TEST_staging_localcalib_proposal 715
A working tag where modifications to the payloads are made often. Used to hold a copy of the local staging payloads, which we then perform modifications on in order to try and remove problems(overlaps, gaps, etc).
OPEN DEV 12/07/2019 1:11 p.m. ddossett 12 1
AIRFLOW_TEST_upload_from_gt 987
A testing tag to check if we can upload local calibration payloads to the prompt calibration from a global tag name.
OPEN DEV 04/24/2020 5:15 a.m. ddossett 34 13
alberto_MC14rd_e_proc12_exp12_chunk2_fix 2348
GT with fixed BeamParameters payloads, to be added to the official MCrd GT
OPEN DEV 02/25/2022 7:35 a.m. martini 38 1
alignment_2019c_v1 763
First attempt to align exp10 VXD + CDC layers + IP. Using Bon cosmics 3431,3432 + physics 3398 (all exp10)
TESTING DEV 11/04/2019 9:03 a.m. bilkat 0 0
alignment_2019c_v2 765
Fixed alignment_2019c_v1 with vertex+beam constrained decays removed
TESTING DEV 11/05/2019 1:35 a.m. tadeas 2 2
alignment_2019c_v3_from3507 853
IP+VXD+CDC alignment, IP+halfshells run-by-run(large runs), sensors+CDClayers once, from run 3507 to run 5896, but last IoVs left open
TESTING DEV 01/13/2020 5:51 p.m. tadeas 165 3
alignment_2019c_v4 867
IP+VXD+CDC alignment for exp10, run-dep.
TESTING DEV 02/02/2020 2:41 a.m. tadeas 173 3
alignment_2020a_testing_v1 1096
First batch of run-by-run (large runs) alignment for VXD shells + PXD sensors, with CDC layer alignment (more granularity only in bucket9, others not yet fixed - one const CDC alignment. Includes BeamSpot alignment for selected runs. Two runs removed due to bug with missing constraint in first time interval - fixed for bucket 9, remaining for rest up to 2500 - no concern
OPEN DEV 05/15/2020 3:39 p.m. tadeas 1722 9
alignment_2020a_testing_v2 1100
First batch of run-by-run (large runs) alignment for VXD shells + PXD sensors, with CDC layer alignment (more granularity only in bucket9, others not yet fixed - one const CDC alignment. Includes BeamSpot alignment for selected runs. Two runs removed due to bug with missing constraint in first time interval - fixed for bucket 9, remaining for rest up to 2500 - no concern. Fixed 2500-3000 run range
OPEN DEV 05/16/2020 10:17 a.m. tadeas 1491 9
alignment_baseline_prompt_reset 2425
Baseline suitable for any current prompt alignment start with wires reset to zero - to have exact same alignment reference at the start of each bucket
TESTING DEV 05/01/2022 11:37 a.m. tadeas 2 2
alignment_BeamSpotFixYSize_v1 1241
reset IP position to 0. + set Y size to 2 um
TESTING DEV 07/25/2020 12:05 p.m. tadeas 1 1
alignment_BFieldOffExp1003Run1 844
GT for alignment MC studies with Magnet OFF in exp1003 run 1 (run 0 and other with Magnet ON
OPEN DEV 12/23/2019 11:33 a.m. bilkat 2 1
alignment_bucket11_runByRun_v1 1132
Advanced run-by-run alignment (incl.PXD sensors) for bucket 11: BeamSpot+VXD+CDC
OPEN DEV 05/30/2020 5:43 p.m. bilkat 738 9
alignment_bucket12_runByRun_v1 1130
Run-by-run pixel sensors + half-shells alignment for bucket12. Multiple CDC intervals
TESTING DEV 05/27/2020 11:31 a.m. bilkat 396 9
alignment_bucket14_it2_withPvalCut 1220
Manual bucket 14 result
TESTING DEV 07/11/2020 2:10 p.m. tadeas 2 2
alignment_bucket15_Aligned3 1531
As Aligned2Best but with IP-z free
TESTING DEV 02/14/2021 6:13 p.m. bilkat 9 9
alignment_bucket15_Aligned4 1534
As Aligned2Best but with IP-xyz free
TESTING DEV 02/15/2021 6:15 p.m. bilkat 9 9
alignment_bucket19_fix 2123
Bucket15 alignment is recalculated again on top of data_reprocessing_prompt which show issues with this bucket - see #BIIPERF-175
TESTING DEV 11/18/2021 8:34 p.m. bilkat 6 6