Questions? Write to T1 CDB team

GlobalTag: 3589 items found         Click on items for more details


Name ID Default? Description Status Type Modified Mod. by Total Payloads Distinct Payloads
mc_production_MC15rd_default 2513
Default tag for run-dependent MC production
OPEN DEV 06/14/2022 7:56 a.m. martini 29 28
staging_mc_nkzwjp_20220614-075602 2512
GDL configuration for exp26. BII-9383 is bad.
OPEN DEV 06/14/2022 7:56 a.m. nkzwjp 6 6
main_2022-06-14 2511
Software Development and Testing Tag This global tag containing necessary payloads for testing of the software and experiment independent MC. It cannot be used to analyze data and only contains payloads for the following intervals of validity: - exp 0: nominal Belle II Configuration with full PXD (full phase 3) - exp 1002: Phase 2 Configuration with minimal vertexing detectors and additional background detectors - exp 1003: Belle II Configuration with partial PXD (early phase 3) Previous global tag: main_2022-05-13 Changes are collected in Pull request #1090, see https://stash.desy.de/projects/B2/repos/basf2/pull-requests/1090
PUBLISHED RELEASE 06/27/2022 3:53 p.m. tuppr_ware 413 371
staging_mc_nkzwjp_20220614-074435 2510
GDL configuration for exp 25. Same purpose one, BII-9382 is bad.
OPEN DEV 06/14/2022 7:45 a.m. nkzwjp 6 6
mc_production_MCrd_default 2509
Default tag for run-dependent MC production
OPEN DEV 06/14/2022 6:47 a.m. martini 53 29
val_CDCdEdx_proc13_chunk3 2508
validation GT of proc13 chunk3 exp14/all runs CDC dE/dx calibration
OPEN DEV 06/13/2022 5:02 a.m. jikumar 369 5
top_staging_proc13chunk3_posttracking 2507
Staging Gt for TOP proc13chunk3 post tracking calibration
TESTING DEV 06/10/2022 7:55 p.m. skohani 377 3
hohmann_mva_NN_testing_100622 2506
for testing NN based lepton ID MVA
TESTING DEV 06/10/2022 1:13 p.m. hohmann 1 1
temp_main_jcerasol_20220610-124425 2505
Added SVD MC cluster position fudge factors and updated cluster position error parameters.
OPEN DEV 06/10/2022 12:45 p.m. jcerasol 2 2
alignment_bucket33 2504
Airflow result for bucket33 - extended to start with run 1917 instead 1996?
TESTING DEV 06/09/2022 8:30 a.m. tadeas 240 6
dfer_Belle_BDT_v4 2503
Fourth version of Belle LID BDT. Electron and muon ID are the same, but now pion, kaon and proton ID has been added
TESTING DEV 06/09/2022 6 a.m. dfer 2 1
L1_config_exp_26_run_1 2502
L1 trigger payloads as of experiment 24 run 1
TESTING DEV 06/14/2022 5:08 p.m. czhearty 6 6
jcerasol_fix_data_rel7 2501
Contains non SVD payloads needed to run on data with master, future rel7
TESTING DEV 06/07/2022 8:53 a.m. gdujany 1 1
mc_production_MC15rd_a_exp24_bucket31 2500
Tag for run-dependent MC production
PUBLISHED DEV 09/24/2022 3:45 p.m. basf2 142 34
mc_production_MC15rd_a_exp24_bucket31_STAGING 2499
Tag for run-dependent MC production
TESTING DEV 08/08/2022 10:14 a.m. basf2 115 7
mc_production_MC15rd_a_exp24_bucket30 2498
Tag for run-dependent MC production
PUBLISHED DEV 09/24/2022 3:44 p.m. basf2 180 34
mc_production_MC15rd_a_exp24_bucket30_STAGING 2497
Tag for run-dependent MC production
TESTING DEV 08/08/2022 2:22 p.m. basf2 114 7
mc_production_MC15rd_a_exp22_bucket30 2496
Tag for run-dependent MC production
TESTING DEV 09/24/2022 3:43 p.m. basf2 0 0
mc_production_MC15rd_a_exp22_bucket30_STAGING 2495
Tag for run-dependent MC production
TESTING DEV 06/06/2022 6:23 a.m. basf2 0 0
alignment_proc13_chunk3 2494
proc13 chunk3 manually merged bucket16 and 16b done separately
TESTING DEV 06/05/2022 8:16 p.m. tadeas 366 6
svd_data_rel7 2493
New or changing SVD paylods data with rel7
TESTING DEV 06/21/2022 10:06 a.m. gdujany 5 5
beam_bg_sim_20211220_early-phase3_belle2-beast2_farbeamline_run-dependent_exp22_run0624-0633_NewIpBeamPipeParts 2492
Early Phase3 Belle II + Beast II within the IR+FarBeamline (|s|<26m). Geometry payloads for the beam-induced background simulation. The FarBeamline geometry is improved (Feb 2022). It requires some modifications of the Belle II sub-system settings (study). The Beast II system is not present in DB, so its geometry is built from the XML file. This GT can be used for the run-dependent MC sample production. exp/run = 22/0624-0633. New IP beam pipe parts.
TESTING DEV 06/03/2022 2:32 a.m. anatochi 19 19
staging_online_hearty_20220602-111506 2491
corrects for time shift from new DSP coefficients
OPEN DEV 06/02/2022 11:15 a.m. hearty 2 2
temp_online_remnev_20220601-085428 2490
Update DSP coefficients in ECL DQM to be consistent with ECL electronics.
OPEN DEV 06/01/2022 8:54 a.m. remnev 3 3
XTNew2 2489
ForTests
OPEN DEV 06/01/2022 6:54 a.m. paololeo 1 1