Questions? Write to T1 CDB team

GlobalTag: 3585 items found         Click on items for more details


Name ID Default? Description Status Type Modified Mod. by Total Payloads Distinct Payloads
mc_production_MC00rd_exp00_bucket05 2084
Tag for run-dependent MC production
OPEN DEV 10/27/2021 2:08 a.m. basf2 0 0
dfer_Belle_BDT_v1 2083
Version 1 of improved PID in Belle
TESTING DEV 10/28/2021 4:40 a.m. dfer 3 1
staging_main_hearty_20211021-195845 2082
expected energies for muon pair calibration with new fit method
OPEN DEV 10/21/2021 7:59 p.m. hearty 1 1
staging_mc_taichiro_20211021-155933 2081
bug fix for mc prod
TESTING DEV 12/24/2021 9:22 a.m. taichiro 114 6
staging_online_bilkat_20211021-152505 2080
needed for reasonable online performance
OPEN DEV 10/21/2021 3:26 p.m. bilkat 2 2
alignment_online_new2021c 2079
New baseline alignment for online GT and 2021c data. Created as average alignment in stage1 from s-proc2
TESTING DEV 10/21/2021 1:46 p.m. bilkat 2 2
staging_online_jikumar_20211021-104935 2078
reset gain to 1 for better abs gain in dqm
OPEN DEV 10/21/2021 10:50 a.m. jikumar 1 1
dfer_Belle_BDT_test 2077
Testing creation of a global tag for improved Belle LID
TESTING DEV 10/25/2021 6:10 a.m. dfer 5 3
staging_online_gdujany_20211020-141952 2076
Update SVD time calibration needed for DQM plots
OPEN DEV 10/20/2021 2:20 p.m. gdujany 3 3
mc_CDCdEdx_rel6 2075
mc rel6 update for ozaki-san
OPEN DEV 10/15/2021 10:58 a.m. jkumar 4 4
staging_online_hearty_20211014-185103 2074
duplicate; previous request failed
OPEN DEV 10/14/2021 6:51 p.m. hearty 2 2
staging_online_hearty_20211014-184930 2073
update electronics calibration for new run period
OPEN DEV 10/14/2021 6:49 p.m. hearty 2 2
beam_bg_sim_20210616_early-phase3_belle2-beast2_farbeamline_improved 2072
Early Phase3 Belle II + Beast II within the IR+FarBeamline (|s|<26m). Geometry payloads for the beam-induced background simulation. It requires some modifications of the Belle II sub-system settings (study). For now, the Beast II system is not present in DB so its geometry is built from the XML file. Tested with the master_2021-06-28 branch. + Modified shielding around Belle II: Floor level of the tunnel fixed (-1950mm -> -1520mm); More realistic accelerator tunnel geometry, though still with some unknowns; Magnets' supports; Cryostat floats supports; Beam pipes extended a little.
TESTING DEV 10/13/2021 5:55 p.m. anatochi 19 19
staging_online_jikumar_20211012-124237 2071
latest calibration
OPEN DEV 10/12/2021 12:43 p.m. jikumar 10 10
online_CDCdEdx_2021c 2070
online GT update for 2021c
PUBLISHED DEV 10/15/2021 10:57 a.m. jkumar 12 12
highest_prior_forproc13 2069
collect payalods that are not in the reco_patch_rel06 and must supersede all existing IoVs for proc13 baseline
TESTING DEV 11/02/2021 4:42 p.m. zani 21 21
testing_online_release-06 2068
Testing purposes
TESTING DEV 10/11/2021 2:43 p.m. depietro 371 356
aux_proc12_forProc13_base 2067
collect proc12 payloads for proc13 baseline, merging data_reprocessing_proc12_chunk1/2
TESTING DEV 10/12/2021 7:13 a.m. zani 30099 238
staging_analysis_pcheema_20211011-113834 2066
updated beam background MVA training
OPEN DEV 10/11/2021 11:40 a.m. pcheema 1 1
staging_analysis_pcheema_20211011-113144 2065
adding new MVA variable to light release
OPEN DEV 10/11/2021 11:32 a.m. pcheema 1 1
testing_HLT_release-06 2064
Testing
TESTING DEV 10/10/2021 6:09 p.m. depietro 42 41
pxd_calibration_dev 2063
Temporary constants for developing new calibration procedure for PXD
TESTING DEV 10/14/2021 5:02 p.m. qyliu 514 4
staging_online_gdujany_20211008-141016 2062
Update SVD payloads
OPEN DEV 10/08/2021 2:10 p.m. gdujany 7 7
staging_main_hearty_20211008-014906 2061
make geometry payloads consistent
OPEN DEV 10/08/2021 1:49 a.m. hearty 5 5
staging_online_gdujany_20211007-153838 2060
New payloads needed for release 6 and update of an old one with more up to date constants
OPEN DEV 10/07/2021 3:38 p.m. gdujany 7 7