|
Name | ID | Default? | Description | Status | Type | Modified | Mod. by | Total Payloads | Distinct Payloads |
---|---|---|---|---|---|---|---|---|---|
AIRFLOW_final_staging_calibration_prompt_snapshotAt20211220 | 2190 | ✘ | Staging GT for holding the Active Payloads from each calibration before merge into final GT |
OPEN | DEV | 12/20/2021 9:21 a.m. | fpham | 2258 | 54 |
upgrade_2021-07-16_vtx_5layer_bgtest_v2 | 2189 | ✘ | Development GT for Belle II w/o PXD+SVD and w/ 5 layer VTX |
TESTING | DEV | 12/19/2021 10:51 a.m. | benni | 18 | 11 |
upgrade_2021-07-16_vtx_5layer_bgtest_v1 | 2188 | ✘ | Development GT for Belle II w/o PXD+SVD and w/ 5 layer VTX |
TESTING | DEV | 12/18/2021 9:10 p.m. | benni | 18 | 11 |
test_gt_tracksmear_v0 | 2187 | ✘ | Test GT for the track smearing values |
TESTING | DEV | 12/17/2021 10:40 a.m. | nrad | 1 | 1 |
test_cdc_MC15ri_exp0 | 2186 | ✘ | temporary GT to copy payloads corresponding to exp1003 from cdc_MC15ri and change the iovs to apply the same for exp0 (for MC15ri_a production) |
OPEN | DEV | 12/17/2021 3:46 a.m. | ansuj | 9 | 8 |
release-06-00-07 | 2185 | ✘ | Software Development and Testing Tag
This global tag containing necessary payloads for testing of the software and
experiment independent MC. It cannot be used to analyze data and only contains
payloads for the following intervals of validity:
- exp 0: nominal Belle II Configuration with full PXD (full phase 3)
- exp 1002: Phase 2 Configuration with minimal vertexing detectors and
additional background detectors
- exp 1003: Belle II Configuration with partial PXD (early phase 3)
Previous global tag: release-06-00-00
Changes are collected in Pull request #599, see https://stash.desy.de/projects/B2/repos/basf2/pull-requests/599 |
PUBLISHED | RELEASE | 05/13/2022 7:55 a.m. | tuppr_ware | 422 | 379 |
alignment_misalignment_Twist_50um | 2184 | ✘ | Weak mode twist misalignment 50um, respecting constraints of type 2 |
TESTING | DEV | 12/16/2021 11:34 a.m. | tadeas | 1 | 1 |
val_CDCdEdx_bucket27 | 2183 | ✘ | validation GT for bucket27 (21/83-21/572) CDC dE/dx calibration |
PUBLISHED | DEV | 01/19/2022 2:38 a.m. | jkumar | 250 | 7 |
mc_production_MC14rd_exp18_bucket24 | 2182 | ✘ | Tag for run-dependent MC production |
TESTING | DEV | 01/24/2022 4:24 p.m. | basf2 | 141 | 44 |
mc_production_MC14rd_exp18_bucket24_STAGING | 2181 | ✘ | Tag for run-dependent MC production |
TESTING | DEV | 01/24/2022 3:41 p.m. | basf2 | 81 | 4 |
mc_production_MC14rd_exp18_bucket23 | 2180 | ✘ | Tag for run-dependent MC production |
TESTING | DEV | 01/24/2022 4:13 p.m. | basf2 | 161 | 44 |
mc_production_MC14rd_exp18_bucket23_STAGING | 2179 | ✘ | Tag for run-dependent MC production |
TESTING | DEV | 01/24/2022 3:31 p.m. | basf2 | 101 | 4 |
data_beam_conditions_proc12_chunk2_off | 2178 | ✘ | beam related payloads for proc12 chunk2 off-resonance |
TESTING | DEV | 03/04/2022 8:58 a.m. | merola | 418 | 3 |
staging_main_jikumar_20211213-130222 | 2177 | ✘ | MC15ri |
OPEN | DEV | 12/13/2021 1:02 p.m. | jikumar | 2 | 2 |
alignment_bucket27_prompt | 2176 | ✘ | Official bucket27 alignment for Airflow upload |
OPEN | DEV | 12/11/2021 10:55 a.m. | tadeas | 72 | 2 |
L1_config_exp_22_run_290 | 2175 | ✘ | L1 trigger payloads as of exp 22 run 290 |
TESTING | DEV | 12/10/2021 3:53 p.m. | czhearty | 6 | 6 |
main_2021-12-10 | 2174 | ✘ | Software Development and Testing Tag
This global tag containing necessary payloads for testing of the software and
experiment independent MC. It cannot be used to analyze data and only contains
payloads for the following intervals of validity:
- exp 0: nominal Belle II Configuration with full PXD (full phase 3)
- exp 1002: Phase 2 Configuration with minimal vertexing detectors and
additional background detectors
- exp 1003: Belle II Configuration with partial PXD (early phase 3)
Previous global tag: main_2021-09-24
Changes are collected in Pull request #590, see https://stash.desy.de/projects/B2/repos/basf2/pull-requests/590 |
PUBLISHED | RELEASE | 05/13/2022 7:35 a.m. | tuppr_ware | 406 | 364 |
bucket22mcBeamParams | 2173 | ✘ | Bucket22 Beam parameters payloads for time-dep MC |
OPEN | DEV | 12/09/2021 2:07 p.m. | zlebcr | 81 | 4 |
mc_production_MC14rd_exp18_bucket22 | 2172 | ✘ | Tag for run-dependent MC production |
TESTING | DEV | 01/04/2022 10:18 a.m. | basf2 | 254 | 45 |
mc_production_MC14rd_exp18_bucket22_STAGING | 2171 | ✘ | Tag for run-dependent MC production |
TESTING | DEV | 12/24/2021 5:27 a.m. | basf2 | 81 | 4 |
BeamSpot_proc12_chunk2_off | 2170 | ✘ | Beam Spot payloads for proc12 chunk2 off-resonance data |
TESTING | DEV | 12/09/2021 11:34 a.m. | zlebcr | 208 | 1 |
BeamSpot_proc2_chunk2_off | 2169 | ✘ | Beam Spot payloads for proc12 chunk2 off-resonance data |
OPEN | DEV | 12/09/2021 10:26 a.m. | zlebcr | 208 | 1 |
beam_bg_sim_20211202_early-phase3_belle2-beast2_farbeamline | 2168 | ✘ | Early Phase3 Belle II + Beast II within the IR+FarBeamline (|s|<26m). Geometry payloads for the beam-induced background simulation. It requires some modifications of the Belle II sub-system settings (study). For now, the Beast II system is not implemented in the DB so its geometry is built from the XML file. |
TESTING | DEV | 12/08/2021 3:48 p.m. | anatochi | 19 | 19 |
broken_GT_fmeier | 2167 | ✘ | Global tag containing payloads for high-level analysis tools available from light-2112-uranus |
OPEN | DEV | 12/28/2021 3:44 p.m. | fmeier | 537 | 537 |
klm_alignment_testing_fmegg | 2166 | ✘ | GT containing only KLM alignment and displacement payloads --- Only for testing purposes |
TESTING | DEV | 12/07/2021 2:42 p.m. | depietro | 11 | 9 |