|
Name | ID | Default? | Description | Status | Type | Modified | Mod. by | Total Payloads | Distinct Payloads |
---|---|---|---|---|---|---|---|---|---|
mc_nominal_beam_config_10751 | 1981 | ✘ | beam payload for the MC generation at 10.751 GeV |
TESTING | DEV | 09/03/2021 7:27 a.m. | tamponi | 4 | 4 |
mc_nominal_beam_config_10706 | 1980 | ✘ | beam payload for the MC generation at 10.706 GeV |
TESTING | DEV | 09/03/2021 7:27 a.m. | tamponi | 4 | 4 |
mc_nominal_beam_config_10657 | 1979 | ✘ | beam payload for the MC generation at 10.657 GeV |
TESTING | DEV | 09/03/2021 7:28 a.m. | tamponi | 4 | 4 |
test_gt_aug31 | 1978 | ✘ | test only |
OPEN | DEV | 08/31/2021 11:24 p.m. | jkumar | 174 | 3 |
mcBeamParsTest | 1977 | ✘ | for testing of the eCMS calib |
TESTING | DEV | 08/31/2021 9:26 p.m. | zlebcr | 3 | 3 |
cdc_sproc2_badwires | 1976 | ✘ | gt with wire list for sproc2 |
OPEN | DEV | 08/31/2021 8:49 a.m. | hsvidras | 1 | 1 |
klm_trigger_parameters_for_s-proc2 | 1975 | ✘ | KLMTriggerParameters payloads for s-proc2 |
OPEN | DEV | 08/30/2021 9:20 a.m. | depietro | 1 | 1 |
test_klm_trigger | 1974 | ✘ | KLMTriggerParameters payloads for s-proc2 |
OPEN | DEV | 08/30/2021 9:16 a.m. | depietro | 1 | 1 |
AIRFLOW_online_snapshot_20210830-071219 | 1973 | ✘ | This is the official GT operating online |
TESTING | DEV | 08/30/2021 7:12 a.m. | chunhua | 1040 | 444 |
svd_test_newReco_exp18 | 1972 | ✘ | tag to test svd reco on exp 18 |
TESTING | DEV | 08/27/2021 4:18 p.m. | casarosa | 3 | 3 |
alignment_s-proc2_test3_stage2 | 1971 | ✘ | Bucket25 realigned for s-proc2 test -stage 2 with SVD ladders free |
TESTING | DEV | 08/27/2021 4:14 p.m. | bilkat | 198 | 6 |
alignment_s-proc2_test2_stage2 | 1970 | ✘ | Bucket25 test for s-proc2 stage2 full baseline 1M per block |
TESTING | DEV | 08/27/2021 2 p.m. | bilkat | 24 | 6 |
alignment_s-proc2_test1_stage2 | 1969 | ✘ | Realigned bucket25 as test for s-proc2 - stage2 |
TESTING | DEV | 08/27/2021 12:50 p.m. | bilkat | 240 | 6 |
alignment_s-proc2_test1_stage1 | 1968 | ✘ | Test of s-proc2 realignment for bucket25 - stage1 |
TESTING | DEV | 08/27/2021 9:06 a.m. | bilkat | 6 | 6 |
dp_simul_release6_patch | 1967 | ✘ | A patch GT that holds new/updated payloads those are required to perform reconstruction on release 06. The main processing GTs data_reprocessing_X and online should be used in chain, together with the MCrd GT. |
TESTING | DEV | 05/24/2022 12:30 p.m. | depietro | 8 | 8 |
staging_master_hitoshi_20210827-052048 | 1966 | ✘ | modify adc simulation slightly |
OPEN | DEV | 08/27/2021 5:22 a.m. | hitoshi | 2 | 1 |
alignment_s-proc2_resetWires | 1965 | ✘ | CDCAlignment from data_reprocessing_prompt bucet24 with wire alignment reset to zeros - to be used as starting point for CDCAlignment for bucket25 in s-proc2 |
TESTING | DEV | 08/26/2021 12:59 p.m. | tadeas | 1 | 1 |
alignment_bucket25prompt_resetWires | 1964 | ✘ | CDCAlignment from data_reprocessing_prompt bucet25 with wire alignment reset to zeros |
TESTING | DEV | 08/26/2021 12:58 p.m. | tadeas | 1 | 1 |
staging_analysis_depietro_20210825-151912 | 1963 | ✘ | A reason |
OPEN | DEV | 08/25/2021 3:19 p.m. | depietro | 1 | 1 |
AIRFLOW_final_staging_calibration_sproc2 | 1962 | ✘ | Final staging payload for s-proc2 |
TESTING | DEV | 09/16/2021 10:08 a.m. | fpham | 1766 | 49 |
AIRFLOW_data_staging_calibration_sproc2 | 1961 | ✘ | Staging payload for s-proc2 data calibration |
TESTING | DEV | 09/16/2021 2:03 a.m. | fpham | 2186 | 53 |
AIRFLOW_data_staging_localcalib_sproc2 | 1960 | ✘ | Staging payload for s-proc2 local calibration |
TESTING | DEV | 08/31/2021 4:45 p.m. | fpham | 7 | 7 |
AIRFLOW_final_staging_calibration_prompt_snapshotAt20210823 | 1959 | ✘ | Staging GT for holding the Active Payloads from each calibration before merge into final GT |
OPEN | DEV | 08/23/2021 7:36 a.m. | fpham | 1704 | 46 |
data_reprocessing_prompt_snapshotAt20210823 | 1958 | ✔ | running GT for the first (prompt) reprocessing |
OPEN | RELEASE | 08/23/2021 7:37 a.m. | tamponi | 59743 | 317 |
leptonid_EPS2021_Official_rel5_v4 | 1957 | ✘ | Lepton ID Data/MC corrections - fixed threshold working points (>0.5, 0.9, 0.95), likelihood LID only. Now outlier channels are not taken into account when assigning the 'distance to avg' systematic. Also now includes D* channels for pion fake rates. |
PUBLISHED | DEV | 01/11/2022 10:44 p.m. | mmilesi | 30 | 30 |