Questions? Write to T1 CDB team

GlobalTag: 3703 items found         Click on items for more details


Name ID Default? Description Status Type Modified Mod. by Total Payloads Distinct Payloads
mcBeamParsTest 1977
for testing of the eCMS calib
TESTING DEV 08/31/2021 9:26 p.m. zlebcr 3 3
cdc_sproc2_badwires 1976
gt with wire list for sproc2
OPEN DEV 08/31/2021 8:49 a.m. hsvidras 1 1
klm_trigger_parameters_for_s-proc2 1975
KLMTriggerParameters payloads for s-proc2
OPEN DEV 08/30/2021 9:20 a.m. depietro 1 1
test_klm_trigger 1974
KLMTriggerParameters payloads for s-proc2
OPEN DEV 08/30/2021 9:16 a.m. depietro 1 1
AIRFLOW_online_snapshot_20210830-071219 1973
This is the official GT operating online
TESTING DEV 08/30/2021 7:12 a.m. chunhua 1040 444
svd_test_newReco_exp18 1972
tag to test svd reco on exp 18
TESTING DEV 08/27/2021 4:18 p.m. casarosa 3 3
alignment_s-proc2_test3_stage2 1971
Bucket25 realigned for s-proc2 test -stage 2 with SVD ladders free
TESTING DEV 08/27/2021 4:14 p.m. bilkat 198 6
alignment_s-proc2_test2_stage2 1970
Bucket25 test for s-proc2 stage2 full baseline 1M per block
TESTING DEV 08/27/2021 2 p.m. bilkat 24 6
alignment_s-proc2_test1_stage2 1969
Realigned bucket25 as test for s-proc2 - stage2
TESTING DEV 08/27/2021 12:50 p.m. bilkat 240 6
alignment_s-proc2_test1_stage1 1968
Test of s-proc2 realignment for bucket25 - stage1
TESTING DEV 08/27/2021 9:06 a.m. bilkat 6 6
dp_simul_release6_patch 1967
A patch GT that holds new/updated payloads those are required to perform reconstruction on release 06. The main processing GTs data_reprocessing_X and online should be used in chain, together with the MCrd GT.
TESTING DEV 05/24/2022 12:30 p.m. depietro 8 8
staging_master_hitoshi_20210827-052048 1966
modify adc simulation slightly
OPEN DEV 08/27/2021 5:22 a.m. hitoshi 2 1
alignment_s-proc2_resetWires 1965
CDCAlignment from data_reprocessing_prompt bucet24 with wire alignment reset to zeros - to be used as starting point for CDCAlignment for bucket25 in s-proc2
TESTING DEV 08/26/2021 12:59 p.m. tadeas 1 1
alignment_bucket25prompt_resetWires 1964
CDCAlignment from data_reprocessing_prompt bucet25 with wire alignment reset to zeros
TESTING DEV 08/26/2021 12:58 p.m. tadeas 1 1
staging_analysis_depietro_20210825-151912 1963
A reason
OPEN DEV 08/25/2021 3:19 p.m. depietro 1 1
AIRFLOW_final_staging_calibration_sproc2 1962
Final staging payload for s-proc2
TESTING DEV 09/16/2021 10:08 a.m. fpham 1766 49
AIRFLOW_data_staging_calibration_sproc2 1961
Staging payload for s-proc2 data calibration
TESTING DEV 09/16/2021 2:03 a.m. fpham 2186 53
AIRFLOW_data_staging_localcalib_sproc2 1960
Staging payload for s-proc2 local calibration
TESTING DEV 08/31/2021 4:45 p.m. fpham 7 7
AIRFLOW_final_staging_calibration_prompt_snapshotAt20210823 1959
Staging GT for holding the Active Payloads from each calibration before merge into final GT
OPEN DEV 08/23/2021 7:36 a.m. fpham 1704 46
data_reprocessing_prompt_snapshotAt20210823 1958
running GT for the first (prompt) reprocessing
OPEN RELEASE 08/23/2021 7:37 a.m. tamponi 59743 317
leptonid_EPS2021_Official_rel5_v4 1957
Lepton ID Data/MC corrections - fixed threshold working points (>0.5, 0.9, 0.95), likelihood LID only. Now outlier channels are not taken into account when assigning the 'distance to avg' systematic. Also now includes D* channels for pion fake rates.
PUBLISHED DEV 01/11/2022 10:44 p.m. mmilesi 30 30
test_clone_aug20_promptgt_kekcc 1956
running GT for the first (prompt) reprocessing
OPEN RELEASE 08/19/2021 1:43 p.m. tamponi 59743 317
test_new_CDCWireHitRequirements_2 1955
Test new CDCWireHitRequirements (2). This GT is temporary and can be deleted if needed.
OPEN DEV 08/18/2021 3:06 p.m. prazcyri 1 1
test_new_CDCWireHitRequirements 1954
Test new CDCWireHitRequirements. This GT is temporary and can be deleted if needed.
OPEN DEV 08/18/2021 2:57 p.m. prazcyri 2 1
data_reprocessing_prompt_clone-2021-08-11 1953
running GT for the first (prompt) reprocessing
OPEN RELEASE 08/11/2021 3:06 p.m. tamponi 59743 317