|
Name | ID | Default? | Description | Status | Type | Inserted | Modified | Mod. by | Total Payloads | Distinct Payloads |
---|---|---|---|---|---|---|---|---|---|---|
alignment_stage1_proc10 | 750 | ✘ | Starting alignment using verte-constrained decays. Still time-independent - the purpose is to now add Boff cosmics (should have been done ideally already at stage 0) and basic time dependence(stage2), then wire-by-wire alignment on top of that(stage3). |
TESTING | DEV | 10/19/2019 3:09 p.m. | 10/19/2019 4:57 p.m. | tadeas | 3 | 3 |
alignment_stage0_proc10_block-7-2734-8-349 | 749 | ✘ | Initial pre-alignment from zeros for proc10 for VXD + CDC (layers) |
TESTING | DEV | 10/19/2019 9:44 a.m. | 10/19/2019 9:58 a.m. | tadeas | 10 | 9 |
data_reprocessing_proc10 | 748 | ✘ | Staging global tag for the major reprocessings |
VALIDATED | DEV | 10/19/2019 7:51 a.m. | 12/17/2019 7:06 p.m. | tamponi | 14737 | 170 |
online_proc10 | 747 | ✘ | This is the official GT operating online |
PUBLISHED | DEV | 10/19/2019 7:46 a.m. | 10/19/2019 7:50 a.m. | chunhua | 723 | 393 |
svd_simulationSVDGeometryParForClusterPosResol | 746 | ✘ | SVDGeometryPar versions containing different noise and other simulation parameters for the cluster residual data-MC study. exp=1003, different runs corresponds to different values, find the correspondence in https://confluence.desy.de/display/BI/SVD+Cluster+Position+Resolution |
TESTING | DEV | 10/15/2019 10:26 a.m. | 06/18/2020 5:49 p.m. | casarosa | 8 | 4 |
AIRFLOW_TEST_cloning | 745 | ✘ | A working tag where modifications to the payloads are made often. Used to hold a copy of the local staging payloads, which we then perform modifications on in order to try and remove problems(overlaps, gaps, etc). |
OPEN | DEV | 10/12/2019 7:19 a.m. | 10/12/2019 7:19 a.m. | ddossett | 4 | 3 |
ECL_timing_pre_proc10_v3 | 744 | ✘ | GT to gather all the ECL timing calibrations for proc10 |
OPEN | DEV | 10/11/2019 5:45 a.m. | 10/11/2019 5:45 a.m. | ehill | 356 | 2 |
ECL_timing_pre_proc10_backup_v2 | 743 | ✘ | GT to gather all the ECL timing calibrations for proc10 |
OPEN | DEV | 10/11/2019 4:02 a.m. | 10/11/2019 4:02 a.m. | ehill | 355 | 2 |
ECL_timing_pre_proc10_v2 | 742 | ✘ | GT to gather all the ECL timing calibrations for proc10 |
OPEN | DEV | 10/11/2019 1:21 a.m. | 10/11/2019 1:21 a.m. | ehill | 2 | 2 |
ECL_timing_pre_proc10_backup | 741 | ✘ | GT to gather all the ECL timing calibrations for proc10 |
OPEN | DEV | 10/11/2019 12:56 a.m. | 10/11/2019 12:56 a.m. | ehill | 356 | 2 |
ECL_timing_pre_proc10 | 740 | ✘ | GT to gather all the ECL timing calibrations for proc10 |
OPEN | DEV | 10/11/2019 12:39 a.m. | 10/11/2019 12:39 a.m. | ehill | 356 | 2 |
saurabh_test | 739 | ✘ | for test purpose |
OPEN | DEV | 10/10/2019 2:44 p.m. | 10/10/2019 2:44 p.m. | saurabh | 29 | 6 |
clone-online-20191010-tmp | 738 | ✘ | temporary gt for testing |
OPEN | DEV | 10/10/2019 2:25 a.m. | 10/22/2019 7:44 a.m. | chunhua | 674 | 371 |
staging_master_jikumar_20191010-020206 | 737 | ✘ | Switching back to the old MC payload versions for better PID performance. The latest payload from real data will be updated after full calibration |
OPEN | DEV | 10/10/2019 2:03 a.m. | 10/10/2019 2:03 a.m. | jikumar | 2 | 2 |
alignment_reset_CDC | 736 | ✘ | This GT contains CDC alignment reset to zeros (layers and wires x,y) and z-positions of wires inherited from older payloads(from survey) |
TESTING | DEV | 10/08/2019 7:15 p.m. | 10/08/2019 7:17 p.m. | tadeas | 1 | 1 |
staging_master_ritter_20191004-115027 | 735 | ✘ | reason |
INVALID | DEV | 10/04/2019 11:50 a.m. | 10/04/2019 12:06 p.m. | ritter | 0 | 0 |
staging_master_ritter_20191004-114803 | 734 | ✘ | reason |
INVALID | DEV | 10/04/2019 11:48 a.m. | 10/04/2019 12:06 p.m. | ritter | 0 | 0 |
staging_master_ritter_20191004-114650 | 733 | ✘ | reason |
INVALID | DEV | 10/04/2019 11:47 a.m. | 10/04/2019 12:06 p.m. | ritter | 0 | 0 |
staging_master_ritter_20191004-114549 | 732 | ✘ | reason |
INVALID | DEV | 10/04/2019 11:45 a.m. | 10/04/2019 12:06 p.m. | ritter | 0 | 0 |
staging_master_ritter_20191004-114504 | 731 | ✘ | reason |
INVALID | DEV | 10/04/2019 11:45 a.m. | 10/04/2019 12:06 p.m. | ritter | 0 | 0 |
staging_master_ritter_20191004-114255 | 730 | ✘ | testing |
INVALID | DEV | 10/04/2019 11:43 a.m. | 10/04/2019 12:06 p.m. | ritter | 0 | 0 |
gdujany_BIISVD-175 | 729 | ✘ | GT containing the modified versions of the payloads mentioned in BIISVD-175 where m_uniqueID is filled |
TESTING | DEV | 10/04/2019 8:29 a.m. | 11/11/2019 3:31 p.m. | gdujany | 3 | 3 |
test_chargedpidmva_Oct2019_v0 | 728 | ✘ | To include charged PID MVA payload for testing |
OPEN | DEV | 10/03/2019 11:13 a.m. | 10/13/2022 5:15 a.m. | mmilesi | 1 | 1 |
staging_analysis_uenot_20191002-145443 | 727 | ✘ | Current pi0/eta veto tool in modularAnalysis.py uses the development global tag, which will be terminated for release-04. The payloads for pi0/eta veto tool should be moved to the "analysis" global tag. |
OPEN | DEV | 10/02/2019 2:55 p.m. | 10/02/2019 2:55 p.m. | uenot | 2 | 2 |
staging_data_taichiro_20191001-050724 | 726 | ✘ | new payload for trgcdc2d unpacker |
OPEN | DEV | 10/01/2019 5:07 a.m. | 10/01/2019 5:07 a.m. | taichiro | 2 | 1 |