|
Name | ID | Default? | Description | Status | Type | Inserted | Modified | Mod. by | Total Payloads | Distinct Payloads |
---|---|---|---|---|---|---|---|---|---|---|
mc_production_MC14rd_e_exp18_bucket21 | 2320 | ✘ | Tag for run-dependent MC production |
TESTING | DEV | 01/31/2022 7:13 p.m. | 01/31/2022 7:22 p.m. | basf2 | 224 | 45 |
beam_bg_sim_partialVXD_snowmass_08mm_belle2-beast2_farbeamline | 2319 | ✘ | Early Phase3 (partial VXD) Belle II + Beast II within the IR+FarBeamline (|s|<29m). Geometry payloads for the beam-induced background simulation. It requires some modifications of the Belle II sub-system settings (study). For now, the Beast II system is not present in DB so its geometry is built from the XML file. Used for the Snowmass beta*y=0.8mm optics. |
TESTING | DEV | 01/29/2022 11:26 p.m. | 01/29/2022 11:28 p.m. | anatochi | 19 | 19 |
proc12_chunk2_off2_mcBeamParams | 2318 | ✘ | Proc12 chunk2 off-resonance (5513 - 5736) Beam parameters payloads for time-dep MC |
OPEN | DEV | 01/28/2022 3:52 p.m. | 01/28/2022 3:52 p.m. | zlebcr | 30 | 4 |
proc12_chunk2_off1_mcBeamParams | 2317 | ✘ | Proc12 chunk2 off-resonance (3973 - 4191) Beam parameters payloads for time-dep MC |
OPEN | DEV | 01/28/2022 3:52 p.m. | 01/28/2022 3:52 p.m. | zlebcr | 25 | 4 |
CollisionEnergy_proc12_chunk2_off | 2316 | ✘ | Collision invariant mass payloads for proc12 chunk2 off-resonance data |
TESTING | DEV | 01/28/2022 2:07 p.m. | 01/28/2022 2:14 p.m. | zlebcr | 2 | 1 |
BoostVector_proc12_chunk2_off | 2315 | ✘ | Boost Vector payloads for proc12 chunk2 off-resonance data |
TESTING | DEV | 01/28/2022 1:35 p.m. | 01/28/2022 2:13 p.m. | zlebcr | 208 | 1 |
main_2022-01-27 | 2314 | ✘ | Software Development and Testing Tag
This global tag containing necessary payloads for testing of the software and
experiment independent MC. It cannot be used to analyze data and only contains
payloads for the following intervals of validity:
- exp 0: nominal Belle II Configuration with full PXD (full phase 3)
- exp 1002: Phase 2 Configuration with minimal vertexing detectors and
additional background detectors
- exp 1003: Belle II Configuration with partial PXD (early phase 3)
Previous global tag: main_2022-01-14
Changes are collected in Pull request #664, see https://stash.desy.de/projects/B2/repos/basf2/pull-requests/664 |
PUBLISHED | RELEASE | 01/27/2022 12:07 p.m. | 05/13/2022 7:37 a.m. | tuppr_ware | 406 | 364 |
leptonid_Moriond2022_Official_rel5_v1a | 2313 | ✘ | Lepton ID Data/MC corrections, based on 127 1/fb (~66%) of the Moriond 2022 DS - fixed threshold working points (>0.5, 0.9, 0.95, likelihood LID only) and uniform efficiency working points (60,70,80,90, 95%, both likelihood and BDT LID). Only difference wrt/ v1 is a new naming scheme for likelihood-based PID variables, to show explictly which subdetectors are excluded (if any). |
VALIDATED | DEV | 01/27/2022 2:42 a.m. | 02/24/2022 12:46 a.m. | mmilesi | 130 | 130 |
bucket22mcBeamParams2 | 2312 | ✘ | Bucket22 Beam parameters payloads for time-dep MC |
OPEN | DEV | 01/26/2022 2:45 p.m. | 01/26/2022 2:45 p.m. | zlebcr | 81 | 4 |
bucket21mcBeamParams2 | 2311 | ✘ | Bucket21 Beam parameters payloads for time-dep MC |
OPEN | DEV | 01/26/2022 2:25 p.m. | 01/26/2022 2:25 p.m. | zlebcr | 51 | 4 |
bucket20mcBeamParams2 | 2310 | ✘ | Bucket20 Beam parameters payloads for time-dep MC |
OPEN | DEV | 01/26/2022 12:45 p.m. | 01/26/2022 12:45 p.m. | zlebcr | 62 | 4 |
staging_main_nkzwjp_20220126-065254 | 2309 | ✘ | Latest one. |
TESTING | DEV | 01/26/2022 6:53 a.m. | 01/26/2022 7:38 a.m. | nkzwjp | 137 | 6 |
staging_master_jiqp2020_20220125-100124 | 2308 | ✘ | MC13a is simulated in the software release-04-00-03 |
OPEN | DEV | 01/25/2022 10:01 a.m. | 01/25/2022 10:01 a.m. | jiqp2020 | 1 | 1 |
staging_master_jiqp2020_20220125-095541 | 2307 | ✘ | MC13b is simulated in the software release-04-01-00 |
OPEN | DEV | 01/25/2022 9:55 a.m. | 01/25/2022 9:55 a.m. | jiqp2020 | 1 | 1 |
staging_master_jiqp2020_20220125-094704 | 2306 | ✘ | MC14a is simulated in the software release-05-02-00 |
TESTING | DEV | 01/25/2022 9:47 a.m. | 01/25/2022 10:59 a.m. | jiqp2020 | 1 | 1 |
staging_main_livent_20220125-082914 | 2305 | ✘ | fast bug fixes after major IR geometry update |
OPEN | DEV | 01/25/2022 8:29 a.m. | 01/25/2022 8:29 a.m. | livent | 3 | 3 |
svd_mc_production_MC15rd | 2304 | ✘ | Contains the SVD payloads to be used for the run dependent MC15rd production instead of the ones data ones |
PUBLISHED | DEV | 01/24/2022 9:48 p.m. | 04/12/2022 9:18 a.m. | gdujany | 13 | 13 |
mc14a_BeamSpotUnc_thXYdn | 2303 | ✘ | Beam spot uncertainity systamatic shifts based on MC14a |
TESTING | DEV | 01/24/2022 7:09 p.m. | 01/24/2022 7:09 p.m. | zlebcr | 1 | 1 |
mc14a_BeamSpotUnc_thXYup | 2302 | ✘ | Beam spot uncertainity systamatic shifts based on MC14a |
TESTING | DEV | 01/24/2022 7:08 p.m. | 01/24/2022 7:08 p.m. | zlebcr | 1 | 1 |
mc14a_BeamSpotUnc_thYZdn | 2301 | ✘ | Beam spot uncertainity systamatic shifts based on MC14a |
TESTING | DEV | 01/24/2022 7:08 p.m. | 01/24/2022 7:08 p.m. | zlebcr | 1 | 1 |
mc14a_BeamSpotUnc_thYZup | 2300 | ✘ | Beam spot uncertainity systamatic shifts based on MC14a |
TESTING | DEV | 01/24/2022 7:07 p.m. | 01/24/2022 7:08 p.m. | zlebcr | 1 | 1 |
mc14a_BeamSpotUnc_thXZdn | 2299 | ✘ | Beam spot uncertainity systamatic shifts based on MC14a |
TESTING | DEV | 01/24/2022 7:07 p.m. | 01/24/2022 7:07 p.m. | zlebcr | 1 | 1 |
mc14a_BeamSpotUnc_thXZup | 2298 | ✘ | Beam spot uncertainity systamatic shifts based on MC14a |
TESTING | DEV | 01/24/2022 7:06 p.m. | 01/24/2022 7:07 p.m. | zlebcr | 1 | 1 |
mc14a_BeamSpotUnc_sizeZdn | 2297 | ✘ | Beam spot uncertainity systamatic shifts based on MC14a |
TESTING | DEV | 01/24/2022 7:06 p.m. | 01/24/2022 7:06 p.m. | zlebcr | 1 | 1 |
mc14a_BeamSpotUnc_sizeZup | 2296 | ✘ | Beam spot uncertainity systamatic shifts based on MC14a |
TESTING | DEV | 01/24/2022 7:05 p.m. | 01/24/2022 7:06 p.m. | zlebcr | 1 | 1 |