Questions? Write to T1 CDB team

Comparison of Global Tags. Specify a pair of IDs or a pair of names.

⇐      Specify the tags to compare      ⇒

Global Tags

Name ID Default? Description Status Type Inserted Modified Mod. by Total Payloads Distinct Payloads
upgrade_2021-10-31_vtx_6layer 2095
Development GT for Belle II w/o PXD+SVD and w/ 6 layer VTX
TESTING DEV 10/31/2021 10:02 p.m. 10/31/2021 10:02 p.m. benni 4 4
mc_production_MC14rd_exp18_bucket19_STAGING 2094
Staging Tag for MCrd
OPEN DEV 10/30/2021 4:36 a.m. 11/09/2021 10:03 p.m. fpham 97 45
hlt_filters_exp20 2093
HLT filters and prescales for experiment 20 Fall 2021
TESTING DEV 10/30/2021 2:03 a.m. 11/01/2021 4:28 p.m. czhearty 105 105
staging_online_hearty_20211028-155502 2092
temperature changes in forward endcap
OPEN DEV 10/28/2021 3:55 p.m. 10/28/2021 3:55 p.m. hearty 2 2
upgrade_development_vtx_6layer 2091
Development GT for Belle II w/o PXD+SVD and w/ 6 layer VTX
OPEN DEV 10/28/2021 12:21 p.m. 10/28/2021 12:21 p.m. benni 7 6
mc_production_MC14rd_exp18_bucket25_STAGING 2090
Tag for run-dependent MC production
TESTING DEV 10/28/2021 10:41 a.m. 11/23/2021 2:49 p.m. fpham 2 2
dfer_Belle_BDT_v2 2089
Global tag for improved Belle LID, with equal sized training samples
TESTING DEV 10/28/2021 4:45 a.m. 10/28/2021 4:47 a.m. dfer 1 1
staging_online_nkzwjp_20211028-010337 2088
New trgger bits for 2021c runs.
OPEN DEV 10/28/2021 1:04 a.m. 10/28/2021 1:04 a.m. nkzwjp 6 6
AIRFLOW_mc_production_MC00rd_exp00_bucket05_STAGING_clone 2087
Tag for run-dependent MC production
OPEN DEV 10/25/2021 11:44 p.m. 10/25/2021 11:44 p.m. basf2 62 14
mc_production_MC14rd_EMPTY_baseline 2086
Empty GT for MCrd bucket25 tag definitions
TESTING DEV 10/25/2021 11:35 p.m. 10/25/2021 11:36 p.m. fpham 0 0
mc_production_MC00rd_exp00_bucket05_STAGING 2085
Tag for run-dependent MC production
OPEN DEV 10/25/2021 7:04 a.m. 10/25/2021 11:43 p.m. basf2 62 14
mc_production_MC00rd_exp00_bucket05 2084
Tag for run-dependent MC production
OPEN DEV 10/25/2021 7:04 a.m. 10/27/2021 2:08 a.m. basf2 0 0
dfer_Belle_BDT_v1 2083
Version 1 of improved PID in Belle
TESTING DEV 10/25/2021 6:15 a.m. 10/28/2021 4:40 a.m. dfer 3 1
staging_main_hearty_20211021-195845 2082
expected energies for muon pair calibration with new fit method
OPEN DEV 10/21/2021 7:59 p.m. 10/21/2021 7:59 p.m. hearty 1 1
staging_mc_taichiro_20211021-155933 2081
bug fix for mc prod
TESTING DEV 10/21/2021 4 p.m. 12/24/2021 9:22 a.m. taichiro 114 6
staging_online_bilkat_20211021-152505 2080
needed for reasonable online performance
OPEN DEV 10/21/2021 3:26 p.m. 10/21/2021 3:26 p.m. bilkat 2 2
alignment_online_new2021c 2079
New baseline alignment for online GT and 2021c data. Created as average alignment in stage1 from s-proc2
TESTING DEV 10/21/2021 1:19 p.m. 10/21/2021 1:46 p.m. bilkat 2 2
staging_online_jikumar_20211021-104935 2078
reset gain to 1 for better abs gain in dqm
OPEN DEV 10/21/2021 10:50 a.m. 10/21/2021 10:50 a.m. jikumar 1 1
dfer_Belle_BDT_test 2077
Testing creation of a global tag for improved Belle LID
TESTING DEV 10/21/2021 3 a.m. 10/25/2021 6:10 a.m. dfer 5 3
staging_online_gdujany_20211020-141952 2076
Update SVD time calibration needed for DQM plots
OPEN DEV 10/20/2021 2:20 p.m. 10/20/2021 2:20 p.m. gdujany 3 3
mc_CDCdEdx_rel6 2075
mc rel6 update for ozaki-san
OPEN DEV 10/15/2021 10:56 a.m. 10/15/2021 10:58 a.m. jkumar 4 4
staging_online_hearty_20211014-185103 2074
duplicate; previous request failed
OPEN DEV 10/14/2021 6:51 p.m. 10/14/2021 6:51 p.m. hearty 2 2
staging_online_hearty_20211014-184930 2073
update electronics calibration for new run period
OPEN DEV 10/14/2021 6:49 p.m. 10/14/2021 6:49 p.m. hearty 2 2
beam_bg_sim_20210616_early-phase3_belle2-beast2_farbeamline_improved 2072
Early Phase3 Belle II + Beast II within the IR+FarBeamline (|s|<26m). Geometry payloads for the beam-induced background simulation. It requires some modifications of the Belle II sub-system settings (study). For now, the Beast II system is not present in DB so its geometry is built from the XML file. Tested with the master_2021-06-28 branch. + Modified shielding around Belle II: Floor level of the tunnel fixed (-1950mm -> -1520mm); More realistic accelerator tunnel geometry, though still with some unknowns; Magnets' supports; Cryostat floats supports; Beam pipes extended a little.
TESTING DEV 10/13/2021 5:52 p.m. 10/13/2021 5:55 p.m. anatochi 19 19
staging_online_jikumar_20211012-124237 2071
latest calibration
OPEN DEV 10/12/2021 12:43 p.m. 10/12/2021 12:43 p.m. jikumar 10 10