|
Name | ID | Default? | Description | Status | Type | Inserted | Modified | Mod. by | Total Payloads | Distinct Payloads |
---|---|---|---|---|---|---|---|---|---|---|
upgrade_2021-10-31_vtx_6layer | 2095 | ✘ | Development GT for Belle II w/o PXD+SVD and w/ 6 layer VTX |
TESTING | DEV | 10/31/2021 10:02 p.m. | 10/31/2021 10:02 p.m. | benni | 4 | 4 |
mc_production_MC14rd_exp18_bucket19_STAGING | 2094 | ✘ | Staging Tag for MCrd |
OPEN | DEV | 10/30/2021 4:36 a.m. | 11/09/2021 10:03 p.m. | fpham | 97 | 45 |
hlt_filters_exp20 | 2093 | ✘ | HLT filters and prescales for experiment 20 Fall 2021 |
TESTING | DEV | 10/30/2021 2:03 a.m. | 11/01/2021 4:28 p.m. | czhearty | 105 | 105 |
staging_online_hearty_20211028-155502 | 2092 | ✘ | temperature changes in forward endcap |
OPEN | DEV | 10/28/2021 3:55 p.m. | 10/28/2021 3:55 p.m. | hearty | 2 | 2 |
upgrade_development_vtx_6layer | 2091 | ✘ | Development GT for Belle II w/o PXD+SVD and w/ 6 layer VTX |
OPEN | DEV | 10/28/2021 12:21 p.m. | 10/28/2021 12:21 p.m. | benni | 7 | 6 |
mc_production_MC14rd_exp18_bucket25_STAGING | 2090 | ✘ | Tag for run-dependent MC production |
TESTING | DEV | 10/28/2021 10:41 a.m. | 11/23/2021 2:49 p.m. | fpham | 2 | 2 |
dfer_Belle_BDT_v2 | 2089 | ✘ | Global tag for improved Belle LID, with equal sized training samples |
TESTING | DEV | 10/28/2021 4:45 a.m. | 10/28/2021 4:47 a.m. | dfer | 1 | 1 |
staging_online_nkzwjp_20211028-010337 | 2088 | ✘ | New trgger bits for 2021c runs. |
OPEN | DEV | 10/28/2021 1:04 a.m. | 10/28/2021 1:04 a.m. | nkzwjp | 6 | 6 |
AIRFLOW_mc_production_MC00rd_exp00_bucket05_STAGING_clone | 2087 | ✘ | Tag for run-dependent MC production |
OPEN | DEV | 10/25/2021 11:44 p.m. | 10/25/2021 11:44 p.m. | basf2 | 62 | 14 |
mc_production_MC14rd_EMPTY_baseline | 2086 | ✘ | Empty GT for MCrd bucket25 tag definitions |
TESTING | DEV | 10/25/2021 11:35 p.m. | 10/25/2021 11:36 p.m. | fpham | 0 | 0 |
mc_production_MC00rd_exp00_bucket05_STAGING | 2085 | ✘ | Tag for run-dependent MC production |
OPEN | DEV | 10/25/2021 7:04 a.m. | 10/25/2021 11:43 p.m. | basf2 | 62 | 14 |
mc_production_MC00rd_exp00_bucket05 | 2084 | ✘ | Tag for run-dependent MC production |
OPEN | DEV | 10/25/2021 7:04 a.m. | 10/27/2021 2:08 a.m. | basf2 | 0 | 0 |
dfer_Belle_BDT_v1 | 2083 | ✘ | Version 1 of improved PID in Belle |
TESTING | DEV | 10/25/2021 6:15 a.m. | 10/28/2021 4:40 a.m. | dfer | 3 | 1 |
staging_main_hearty_20211021-195845 | 2082 | ✘ | expected energies for muon pair calibration with new fit method |
OPEN | DEV | 10/21/2021 7:59 p.m. | 10/21/2021 7:59 p.m. | hearty | 1 | 1 |
staging_mc_taichiro_20211021-155933 | 2081 | ✘ | bug fix for mc prod |
TESTING | DEV | 10/21/2021 4 p.m. | 12/24/2021 9:22 a.m. | taichiro | 114 | 6 |
staging_online_bilkat_20211021-152505 | 2080 | ✘ | needed for reasonable online performance |
OPEN | DEV | 10/21/2021 3:26 p.m. | 10/21/2021 3:26 p.m. | bilkat | 2 | 2 |
alignment_online_new2021c | 2079 | ✘ | New baseline alignment for online GT and 2021c data. Created as average alignment in stage1 from s-proc2 |
TESTING | DEV | 10/21/2021 1:19 p.m. | 10/21/2021 1:46 p.m. | bilkat | 2 | 2 |
staging_online_jikumar_20211021-104935 | 2078 | ✘ | reset gain to 1 for better abs gain in dqm |
OPEN | DEV | 10/21/2021 10:50 a.m. | 10/21/2021 10:50 a.m. | jikumar | 1 | 1 |
dfer_Belle_BDT_test | 2077 | ✘ | Testing creation of a global tag for improved Belle LID |
TESTING | DEV | 10/21/2021 3 a.m. | 10/25/2021 6:10 a.m. | dfer | 5 | 3 |
staging_online_gdujany_20211020-141952 | 2076 | ✘ | Update SVD time calibration needed for DQM plots |
OPEN | DEV | 10/20/2021 2:20 p.m. | 10/20/2021 2:20 p.m. | gdujany | 3 | 3 |
mc_CDCdEdx_rel6 | 2075 | ✘ | mc rel6 update for ozaki-san |
OPEN | DEV | 10/15/2021 10:56 a.m. | 10/15/2021 10:58 a.m. | jkumar | 4 | 4 |
staging_online_hearty_20211014-185103 | 2074 | ✘ | duplicate; previous request failed |
OPEN | DEV | 10/14/2021 6:51 p.m. | 10/14/2021 6:51 p.m. | hearty | 2 | 2 |
staging_online_hearty_20211014-184930 | 2073 | ✘ | update electronics calibration for new run period |
OPEN | DEV | 10/14/2021 6:49 p.m. | 10/14/2021 6:49 p.m. | hearty | 2 | 2 |
beam_bg_sim_20210616_early-phase3_belle2-beast2_farbeamline_improved | 2072 | ✘ | Early Phase3 Belle II + Beast II within the IR+FarBeamline (|s|<26m). Geometry payloads for the beam-induced background simulation. It requires some modifications of the Belle II sub-system settings (study). For now, the Beast II system is not present in DB so its geometry is built from the XML file. Tested with the master_2021-06-28 branch. + Modified shielding around Belle II: Floor level of the tunnel fixed (-1950mm -> -1520mm); More realistic accelerator tunnel geometry, though still with some unknowns; Magnets' supports; Cryostat floats supports; Beam pipes extended a little. |
TESTING | DEV | 10/13/2021 5:52 p.m. | 10/13/2021 5:55 p.m. | anatochi | 19 | 19 |
staging_online_jikumar_20211012-124237 | 2071 | ✘ | latest calibration |
OPEN | DEV | 10/12/2021 12:43 p.m. | 10/12/2021 12:43 p.m. | jikumar | 10 | 10 |