|
Name | ID | Default? | Description | Status | Type | Inserted | Modified | Mod. by | Total Payloads | Distinct Payloads |
---|---|---|---|---|---|---|---|---|---|---|
cdc_bucket23_badwires | 1901 | ✘ | global tag containing preliminary bad wires for bucket 23 |
OPEN | DEV | 07/09/2021 11:42 a.m. | 07/09/2021 11:42 a.m. | hsvidras | 1 | 1 |
localdb_gdl_20210603_rundependent_for_lum | 1900 | ✘ | for_offline_luminosity_measurements |
TESTING | RELEASE | 07/08/2021 3:08 p.m. | 07/08/2021 3:12 p.m. | Jianshe_Zhou | 114 | 6 |
AIRFLOW_online_snapshot_20210708-101027 | 1899 | ✘ | This is the official GT operating online |
TESTING | DEV | 07/08/2021 10:10 a.m. | 07/08/2021 10:10 a.m. | chunhua | 1040 | 444 |
AIRFLOW_final_staging_calibration_prompt_snapshotAt20210708_bucket22 | 1898 | ✘ | Staging GT for holding the Active Payloads from each calibration before merge into final GT |
OPEN | DEV | 07/08/2021 9:42 a.m. | 07/08/2021 9:42 a.m. | fpham | 1714 | 51 |
data_reprocessing_prompt_snapshotAt20210708 | 1897 | ✔ | running GT for the first (prompt) reprocessing |
OPEN | RELEASE | 07/08/2021 7:59 a.m. | 07/08/2021 8 a.m. | tamponi | 54209 | 313 |
BeamE_Test_2 | 1896 | ✘ | new payloads testing for beam energy |
TESTING | DEV | 07/08/2021 5:37 a.m. | 07/08/2021 5:40 a.m. | ansuj | 5 | 1 |
BeamE_test | 1895 | ✘ | payloads testing for beam energy |
TESTING | DEV | 07/06/2021 5:35 p.m. | 07/06/2021 5:40 p.m. | ansuj | 19 | 1 |
staging_data_reprocessing_beam_snapshotAt20210706 | 1894 | ✘ | staging global tag for the beam energy calibration in major reprocessings |
OPEN | DEV | 07/06/2021 6:58 a.m. | 07/06/2021 6:58 a.m. | tamponi | 13 | 1 |
val_CDCdEdx_bucket22 | 1893 | ✘ | validation GT for bucket22 (18/1044-18/1475) CDC dE/dx calibration |
PUBLISHED | DEV | 07/05/2021 4:27 p.m. | 01/19/2022 2:42 a.m. | jkumar | 188 | 7 |
beam_bg_sim_20210616_early-phase3_belle2-beast2_ir | 1892 | ✘ | Early Phase3 Belle II + Beast II within the IR (|s|<4m). Geometry payloads for the beam-induced background simulation. It requires some modifications of the Belle II sub-system settings (study). For now, the Beast II system is not present in DB so its geometry is built from the XML file. Tested with the master_2021-06-28 branch. |
TESTING | DEV | 07/05/2021 5:32 a.m. | 07/05/2021 7:06 a.m. | anatochi | 18 | 18 |
beam_bg_sim_20210616_early-phase3_belle2-beast2_farbeamline | 1891 | ✘ | Early Phase3 Belle II + Beast II within the IR+FarBeamline (|s|<26m). Geometry payloads for the beam-induced background simulation. It requires some modifications of the Belle II sub-system settings (study). For now, the Beast II system is not present in DB so its geometry is built from the XML file. Tested with the master_2021-06-28 branch. |
TESTING | DEV | 07/05/2021 5:23 a.m. | 07/05/2021 7:07 a.m. | anatochi | 19 | 19 |
staging_analysis_hsvidras_20210704-201801 | 1890 | ✘ | introducing payloads for photon detection efficiency data/mc ratios and errors |
OPEN | DEV | 07/04/2021 8:20 p.m. | 07/04/2021 8:20 p.m. | hsvidras | 2 | 2 |
staging_master_chilikin_20210701-210059 | 1889 | ✘ | KLM MC time calibration. |
OPEN | DEV | 07/01/2021 9:03 p.m. | 07/01/2021 9:03 p.m. | chilikin | 2 | 2 |
staging_master_depietro_20210701-183631 | 1888 | ✘ | — | OPEN | DEV | 07/01/2021 6:36 p.m. | 07/01/2021 6:36 p.m. | depietro | 1 | 1 |
staging_master_staric_20210701-105509 | 1887 | ✘ | make prism sensitive to track extrapolation |
OPEN | DEV | 07/01/2021 10:56 a.m. | 07/01/2021 10:56 a.m. | staric | 1 | 1 |
staging_master_chilikin_20210630-144941 | 1886 | ✘ | Configuration of KLM reconstruction, new payload. |
OPEN | DEV | 06/30/2021 2:49 p.m. | 06/30/2021 2:49 p.m. | chilikin | 1 | 1 |
staging_master_chilikin_20210630-141339 | 1885 | ✘ | Update of KLM time calibration data to take resolution into account during reconstruction of 2D hits in the future. |
OPEN | DEV | 06/30/2021 2:13 p.m. | 06/30/2021 2:13 p.m. | chilikin | 1 | 1 |
staging_master_chilikin_20210630-122317 | 1884 | ✘ | Update of HardwareClockSettings class to allow for non-integer scaling factors. |
OPEN | DEV | 06/30/2021 12:23 p.m. | 06/30/2021 12:23 p.m. | chilikin | 1 | 1 |
staging_master_hitoshi_20210630-072843 | 1883 | ✘ | for improving adc simulation |
OPEN | DEV | 06/30/2021 7:29 a.m. | 06/30/2021 7:29 a.m. | hitoshi | 2 | 1 |
staging_validation_casarosa_20210630-062742 | 1882 | ✘ | new payload for svd cluster position error computation |
OPEN | DEV | 06/30/2021 6:27 a.m. | 06/30/2021 6:27 a.m. | casarosa | 1 | 1 |
dp_recon_release6_patch | 1881 | ✘ | a patch GT that holds new/updated payloads those are required to perform reconstruction on release 06. The main processing GTs data_reprocessing_X and online should be used in chain |
TESTING | DEV | 06/29/2021 11:03 p.m. | 09/30/2021 3:46 p.m. | jikumar | 17 | 17 |
svd_test_HitTimeSelection_abs_tMax50_tDiff20 | 1880 | ✘ | test GT for svd hit time selection for release-06 for CoG3: |t|< 50 (current = 1), |t_U - t_V|< 20 |
TESTING | DEV | 06/29/2021 3:55 p.m. | 06/29/2021 4:03 p.m. | casarosa | 1 | 1 |
staging_master_casarosa_20210629-152722 | 1879 | ✘ | new payload |
TESTING | DEV | 06/29/2021 3:27 p.m. | 06/29/2021 6:15 p.m. | casarosa | 2 | 2 |
data_reprocessing_proc12_chunk2_at20210629_softTRGAdded | 1878 | ✘ | global tag containing the recalbrated constants for the 12th reprocessing, proc12_chunk2 (exp 12 recalibration) |
OPEN | DEV | 06/29/2021 2:40 p.m. | 06/29/2021 2:41 p.m. | zani | 15005 | 271 |
staging_master_chilikin_20210629-134719 | 1877 | ✘ | Use of global hardware clock settings in KLM simulation. |
OPEN | DEV | 06/29/2021 1:47 p.m. | 06/29/2021 1:47 p.m. | chilikin | 1 | 1 |