Questions? Write to T1 CDB team

Comparison of Global Tags. Specify a pair of IDs or a pair of names.

⇐      Specify the tags to compare      ⇒

Global Tags

Name ID Default? Description Status Type Inserted Modified Mod. by Total Payloads Distinct Payloads
BeamE_test 1895
payloads testing for beam energy
TESTING DEV 07/06/2021 5:35 p.m. 07/06/2021 5:40 p.m. ansuj 19 1
staging_data_reprocessing_beam_snapshotAt20210706 1894
staging global tag for the beam energy calibration in major reprocessings
OPEN DEV 07/06/2021 6:58 a.m. 07/06/2021 6:58 a.m. tamponi 13 1
val_CDCdEdx_bucket22 1893
validation GT for bucket22 (18/1044-18/1475) CDC dE/dx calibration
PUBLISHED DEV 07/05/2021 4:27 p.m. 01/19/2022 2:42 a.m. jkumar 188 7
beam_bg_sim_20210616_early-phase3_belle2-beast2_ir 1892
Early Phase3 Belle II + Beast II within the IR (|s|<4m). Geometry payloads for the beam-induced background simulation. It requires some modifications of the Belle II sub-system settings (study). For now, the Beast II system is not present in DB so its geometry is built from the XML file. Tested with the master_2021-06-28 branch.
TESTING DEV 07/05/2021 5:32 a.m. 07/05/2021 7:06 a.m. anatochi 18 18
beam_bg_sim_20210616_early-phase3_belle2-beast2_farbeamline 1891
Early Phase3 Belle II + Beast II within the IR+FarBeamline (|s|<26m). Geometry payloads for the beam-induced background simulation. It requires some modifications of the Belle II sub-system settings (study). For now, the Beast II system is not present in DB so its geometry is built from the XML file. Tested with the master_2021-06-28 branch.
TESTING DEV 07/05/2021 5:23 a.m. 07/05/2021 7:07 a.m. anatochi 19 19
staging_analysis_hsvidras_20210704-201801 1890
introducing payloads for photon detection efficiency data/mc ratios and errors
OPEN DEV 07/04/2021 8:20 p.m. 07/04/2021 8:20 p.m. hsvidras 2 2
staging_master_chilikin_20210701-210059 1889
KLM MC time calibration.
OPEN DEV 07/01/2021 9:03 p.m. 07/01/2021 9:03 p.m. chilikin 2 2
staging_master_depietro_20210701-183631 1888 OPEN DEV 07/01/2021 6:36 p.m. 07/01/2021 6:36 p.m. depietro 1 1
staging_master_staric_20210701-105509 1887
make prism sensitive to track extrapolation
OPEN DEV 07/01/2021 10:56 a.m. 07/01/2021 10:56 a.m. staric 1 1
staging_master_chilikin_20210630-144941 1886
Configuration of KLM reconstruction, new payload.
OPEN DEV 06/30/2021 2:49 p.m. 06/30/2021 2:49 p.m. chilikin 1 1
staging_master_chilikin_20210630-141339 1885
Update of KLM time calibration data to take resolution into account during reconstruction of 2D hits in the future.
OPEN DEV 06/30/2021 2:13 p.m. 06/30/2021 2:13 p.m. chilikin 1 1
staging_master_chilikin_20210630-122317 1884
Update of HardwareClockSettings class to allow for non-integer scaling factors.
OPEN DEV 06/30/2021 12:23 p.m. 06/30/2021 12:23 p.m. chilikin 1 1
staging_master_hitoshi_20210630-072843 1883
for improving adc simulation
OPEN DEV 06/30/2021 7:29 a.m. 06/30/2021 7:29 a.m. hitoshi 2 1
staging_validation_casarosa_20210630-062742 1882
new payload for svd cluster position error computation
OPEN DEV 06/30/2021 6:27 a.m. 06/30/2021 6:27 a.m. casarosa 1 1
dp_recon_release6_patch 1881
a patch GT that holds new/updated payloads those are required to perform reconstruction on release 06. The main processing GTs data_reprocessing_X and online should be used in chain
TESTING DEV 06/29/2021 11:03 p.m. 09/30/2021 3:46 p.m. jikumar 17 17
svd_test_HitTimeSelection_abs_tMax50_tDiff20 1880
test GT for svd hit time selection for release-06 for CoG3: |t|< 50 (current = 1), |t_U - t_V|< 20
TESTING DEV 06/29/2021 3:55 p.m. 06/29/2021 4:03 p.m. casarosa 1 1
staging_master_casarosa_20210629-152722 1879
new payload
TESTING DEV 06/29/2021 3:27 p.m. 06/29/2021 6:15 p.m. casarosa 2 2
data_reprocessing_proc12_chunk2_at20210629_softTRGAdded 1878
global tag containing the recalbrated constants for the 12th reprocessing, proc12_chunk2 (exp 12 recalibration)
OPEN DEV 06/29/2021 2:40 p.m. 06/29/2021 2:41 p.m. zani 15005 271
staging_master_chilikin_20210629-134719 1877
Use of global hardware clock settings in KLM simulation.
OPEN DEV 06/29/2021 1:47 p.m. 06/29/2021 1:47 p.m. chilikin 1 1
data_reprocessing_proc12_chunk2_snapshotAt20210629_noSoftwareTRG 1876
global tag containing the recalbrated constants for the 12th reprocessing, proc12_chunk2 (exp 12 recalibration)
OPEN DEV 06/29/2021 11:12 a.m. 06/29/2021 11:12 a.m. zani 14988 255
triggerskim_proc12_chunk2_patch 1875
tag to add the missing software trigger payalods to data_reprocessing_proc12_chunk2
PUBLISHED DEV 06/29/2021 10:44 a.m. 06/29/2021 4:45 p.m. zani 18 18
chargedpidmva_rel-05_test 1874
New BDT q-dependent training in release 5. Early phase 3 bkg.
OPEN DEV 06/29/2021 4:24 a.m. 10/13/2022 5:12 a.m. mmilesi 8 8
staging_validation_hearty_20210629-033510 1873
required for validation GT
OPEN DEV 06/29/2021 3:36 a.m. 06/29/2021 3:36 a.m. hearty 6 6
staging_validation_hearty_20210628-210229 1872
payload ECLLeakageCorrections
OPEN DEV 06/28/2021 9:03 p.m. 06/28/2021 9:03 p.m. hearty 1 1
master_2021-06-28 1871
Software Development and Testing Tag This global tag containing necessary payloads for testing of the software and experiment independent MC. It cannot be used to analyze data and only contains payloads for the following intervals of validity: - exp 0: nominal Belle II Configuration with full PXD (full phase 3) - exp 1002: Phase 2 Configuration with minimal vertexing detectors and additional background detectors - exp 1003: Belle II Configuration with partial PXD (early phase 3) Previous global tag: master_2021-06-25 Changes are collected in Pull request #8769, see https://stash.desy.de/projects/B2/repos/software/pull-requests/8769
TESTING RELEASE 06/28/2021 4:17 p.m. 07/01/2021 10:36 p.m. tuppr_ware 419 376